Construction guide (Serbian) · Technical documentation

What goes into technical documentation

Choose IDR, IDP, PGD, PZI or PIO and describe the building. For Article 145, choose the works profile: the list distinguishes preliminary design from a technical description and list of works. Each item cites the rulebook article or annex. For design documentation, you can download a Word draft of the main volume built from the annex forms.

The list does not replace the lead designer's decision on which projects are included (Art. 26), nor the conditions of public authorities. Everything runs in your browser; nothing is sent.

The page controls and notes are in English. The names of documents, volumes, profiles and options, and all quotations from the rulebook, are in Serbian, as in the official text, and are marked as Serbian for screen readers.

1 · Documentation type
2 · Building
The PGD scope depends on the category (Art. 52). Determine a residential building's category in the Building guide → My path to a building (Serbian).

Showing 13 of 37 numbered items of Annex 13 (not shown: 5–11, 15, 20–30, 32, 34–37). If your works are not listed, this checklist does not cover them — read the official annex rather than assuming the rulebook ignores them.

Review of the displayed Annex 13 profiles: 07.10.2026. · Official source · Check the required permit first (Serbian)

3 · Special cases

Checklist

Main volume draft (.docx)

Title page, contents, appointment decision and lead designer's statement, documentation contents, designer and building data — from the forms in Annexes 1, 3 and 8. Empty fields stay as lines with the form's instructions.

Volumes in the documentation

The document is created in your browser; investor data never leaves your computer. Complete the draft and sign it with a qualified electronic signature (Art. 20).

SEARCH
Select Language