Procedures and documentation
What does the OSH coordinator do during preparation of the design?
Answer
Informational English translation. Machine translated; not independently reviewed.
The coordinator coordinates the principles of prevention under Article 10, prepares the Preventive Measures Plan specifying the site layout and specific measures, takes surrounding industrial activities into account where necessary, and prepares relevant OSH information for all work on the construction site. The Plan must include specific measures for work under Annex 2. Appointment of a coordinator depends on Article 4; the presence of two contractors alone does not remove the exemption for up to 300 m² without risk/notification.
Note: The obligations of the investor, employer and coordinator are separate. Article 4 contains the conditions for appointing coordinators; the Plan under Article 8 is required before work begins on the construction site.
Original Serbian quotation
„Координатор за израду пројекта обавља следеће послове:
1) врши координацију примене начела превенције у случајевима наведеним у члану 10. ове уредбе;
2) израђује План првентивних мера безбедности и здравља на раду (Прилог 5) којим је одређено уређење градилишта и специфичне мере за безбедан и здрав рад на том градилишту;
3) води рачуна да се при изради Плана превентивних мера безбедности и здравља на раду (Прилог 5), када је потребно, узму у обзир све индустријске активности у близини градилишта;
4) припрема документа, која у складу са карактеристикама пројекта, садрже релевантне информације из области безбедности и здравља на раду које је потребно узети у обзир у току извођења свих радова на градилишту.
План превентивних мера безбедности и здравља на раду (Прилог 5), из става 1. тачка 2. овог члана, мора да садржи и специфичне мере за безбедан и здрав рад за радове наведене у Прегледу радова при којима се појављује специфичан ризик од настанка повреда и оштећења здравља запослених (Прилог 2).”
Informational English translation of the quotation
The coordinator for preparation of the design performs the following tasks:
1) coordinates application of the principles of prevention in the cases specified in Article 10 of this Regulation;
2) prepares the Occupational Safety and Health Preventive Measures Plan (Annex 5), which specifies the layout of the construction site and specific measures for safe and healthy work at that site;
3) ensures that, when preparing the Occupational Safety and Health Preventive Measures Plan (Annex 5), all industrial activities near the construction site are taken into account where necessary;
4) prepares documents which, in accordance with the characteristics of the design, contain relevant occupational safety and health information that must be taken into account during execution of all work on the construction site.
The Occupational Safety and Health Preventive Measures Plan (Annex 5), referred to in paragraph 1, point 2 of this Article, must also contain specific measures for safe and healthy work for the work listed in the Schedule of work involving a specific risk of injury and harm to employees' health (Annex 2).Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Šta se u uredbi o gradilištima smatra radom na visini?Svaki rad koji zaposleni obavlja koristeći oslonce na visini dva metra i više od čvrste podloge, pri čemu radni prostor nije…
- Može li zaposleni kod izvođača radova biti koordinator za izvođenje radova?Ne. Zaposleni kod izvođača radova ne može biti određen za koordinatora za izvođenje radova (čl. 6 st. 2).
- Na koje se oblasti odnose preventivne mere bezbednosti na gradilištu?Naročito na: uređenost i čistoću gradilišta, saobraćajne površine i prolaze, uslove rada sa materijalima, ispravnost sredstava…
- Koje poslove obavlja koordinator za izvođenje radova?Koordinira primjenu načela prevencije i preventivnih mjera, predlaže izmjene Plana preventivnih mera, organizuje saradnju i…
- Koliko često koordinator za izvođenje radova kontroliše gradilište?Svakodnevno na objektima od posebnog značaja za RS sa specifičnim rizikom zbog složenosti izvođenja; svakodnevno kada se izdaje…
- U kom obliku se vodi izvještaj o kontroli gradilišta?U papirnom obliku ili elektronskim putem (čl. 13 st. 2).