Procedures and documentation

Who, under Article 10 of the Regulation, takes prevention into account during the preparation and development of the design?

Answer

Informational English translation. Machine translated; not independently reviewed.

The express addressee of Article 10 is the investor or the investor's representative. In all stages of preparation and development of the design, the investor or representative takes the principles of prevention into account, particularly in architectural, technical, technological and organisational solutions for simultaneous or successive works and in estimating the time needed. The investor or representative also takes into account the required contents of the Plan and the documents referred to in Article 11 point 4 and amendments to them. Article 7 of the Law on Occupational Safety and Health also regulates preventive measures in design; this does not change the addressee of this Article of the Regulation.

Note: The obligations of the investor, employer and coordinator are separate. Article 4 contains the conditions for appointing a coordinator; the Plan under Article 8 is an obligation before work begins at the construction site.

Original Serbian quotation

„Инвеститор, односно заступник инвеститора је дужан да, у свим фазама припреме и израде пројекта, узима у обзир начела обезбеђивања превентивних мера, која су утврђена Законом о безбедности и здрављу на раду, а нарочито када: 1) одлучује о архитектонским, техничким, технолошким и/или организационим решењима, у циљу планирања различитих активности или фаза радова који треба да се изводе истовремено или један за другим; 2) процењује време потребно за завршетак тих радова или фаза радова. Инвеститор, односно заступник инвеститора је дужан да, у свим фазама припреме и израде пројекта, води рачуна о потребној садржини Плана превентивних мера безбедности и здравља на раду (Прилог 5) и докумената из члана 11. став 1. тачка 4) ове уредбе и њиховим изменама.”
Informational English translation of the quotation
The investor or the investor's representative is obliged, in all stages of preparation and development of the design, to take into account the principles of ensuring preventive measures established by the Law on Occupational Safety and Health, particularly when: 1) deciding on architectural, technical, technological and/or organisational solutions, in order to plan different activities or phases of works to be performed simultaneously or successively; 2) estimating the time needed to complete those works or phases of works. The investor or the investor's representative is obliged, in all stages of preparation and development of the design, to take into account the required contents of the Occupational Safety and Health Preventive Measures Plan (Annex 5) and the documents referred to in Article 11 paragraph 1 point 4) of this Regulation and amendments to them.

Official source ↗

Regulation
Uredba o bezbednosti i zdravlju na radu na privremenim ili pokretnim gradilištima
Article
Art. 10
Official gazette
Sl. glasnik RS, br. 14/2009, 95/2010, 98/2018, 35/2023 - dr. zakon i 76/2024
Topic
Procedures and documentation

Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.

Explore related rules →

Related questions

Search building rules

The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal

SEARCH
Select Language