What is stated if a structure cannot be realised without extending infrastructure?

Answer

Informational English translation. Machine translated; not independently reviewed.

When realisation requires new or extended infrastructure or additional preparation or servicing of land, in addition to Article 29, all reasons, alternative means if any, the schedule under the land development programme and the terms of a contract for joint preparation or servicing to the level required for connection are stated.

Note: It is not enough merely to state generally that there is no capacity without explanation and the other prescribed information.

Original Serbian quotation

„Ако се објекат за који је поднет захтев не може реализовати без изградње или доградње комуналне или друге инфраструктуре, односно додатног припремања или опремања грађевинског земљишта, у условима за пројектовање и прикључење се, поред података из члана 29. ове уредбе, наводе и: 1) разлози због којих се објекат за који је поднет захтев не може реализовати без изградње или доградње комуналне или друге инфраструктуре, односно додатног припремања или опремања грађевинског земљишта; 2) алтернативни начини обезбеђивања тих услова, ако постоје; 3) предвиђена динамика реализације недостајуће инфраструктуре, у складу са програмом уређивања грађевинског земљишта; 4) услови за закључење уговора о заједничком припремању, односно опремању грађевинског земљишта, у циљу довођења постојеће инфраструктуре на ниво неопходан за прикључење објекта из идејног решења. 2. Услови за пројектовање и прикључење у којима се констатује да није могућа изградња објекта у складу са поднетим захтевом”
Informational English translation of the quotation
If the structure for which an application has been submitted cannot be realised without construction or extension of utility or other infrastructure, or additional preparation or servicing of construction land, the design and connection conditions shall state, in addition to the information under Article 29 of this regulation: 1) the reasons why the structure for which an application has been submitted cannot be realised without construction or extension of utility or other infrastructure, or additional preparation or servicing of construction land; 2) alternative ways of providing those conditions, if any; 3) the envisaged schedule for realisation of the missing infrastructure, in accordance with the construction land development programme; 4) conditions for concluding a contract for joint preparation or servicing of construction land, with the aim of bringing existing infrastructure to the level necessary to connect the structure from the concept design (IDR). 2. Design and connection conditions stating that construction of the structure in accordance with the submitted application is not possible

Official source ↗

Regulation
Uredba o lokacijskim uslovima
Article
Art. 30
Official gazette
Sl. glasnik RS, br. 87/2023 i 96/2026
Topic
Procedures and documentation

Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.

Explore related rules →

Related questions

Search building rules

The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal

SEARCH
Select Language