Procedures and documentation
Where is the geodetic report submitted before an occupancy permit is issued?
Answer
Informational English translation. Machine translated; not independently reviewed.
The geodetic works report is submitted for review to the authority responsible for the state survey and cadastre. The time limits for issuing the permit do not run while the review is ongoing.
Original Serbian quotation
„Elaborat geodetskih radova se pre izdavanja upotrebne dozvole dostavlja na pregled organu nadležnom za poslove državnog premera i katastra. Dok traje pregled elaborata, ne teku rokovi za izdavanje upotrebne dozvole.”
Informational English translation of the quotation
Before the occupancy permit is issued, the geodetic works report is submitted for review to the authority responsible for the state survey and cadastre. The time limits for issuing the occupancy permit do not run while the report is being reviewed.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Da li organ provjerava naknadu za korišćenje javnog zemljišta pri UD ?Pri izdavanju UD organ ne provjerava plaćanje naknade za korišćenje zemljišta javne svojine. Ako je dokaz dostavljen radi…
- Kako organ provjerava zahtjev za UD i obavezu spajanja parcela?Provjerava nadležnost, zakonom dopuštenog podnosioca, formu/podatke, svu dokumentaciju i takse. Ako je GD za više parcela sa…
- If technical documentation is submitted in DWF/DWFX/DWG, must a PDF also be provided?Yes. DWF/DWFX/DWG is permitted in prescribed cases, but a copy in PDF format, appropriately electronically signed, must also be…
- Is a CEOP application submitted and signed through CIS?Yes. The relevant application is completed through CIS and signed with the qualified electronic signature of the applicant or…
- In what format is a site plan submitted to CEOP?The site plan must also be submitted in DWG or DXF format, georeferenced in the national coordinate system, together with the…
- What must be attached when a CEOP application is submitted through an authorised representative?A power of attorney in electronic PDF form with a qualified electronic signature, or a properly digitised power of attorney…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal