Procedures and documentation
How is the case handled when the holder of public powers is also the investor?
Answer
Informational English translation. Machine translated; not independently reviewed.
A special regime without prior location conditions applies when the holder is also the investor in the specifically listed reconstruction, rehabilitation or adaptation works on infrastructure and connections covered by ZPI 145, with design and connection, crossing and parallel routing conditions from all relevant managers along the route. Article 28 additionally governs exceptions for 133 and the case of a connection for which conditions are provided only by the investor itself.
Note: In Article 5, after the addition of the solar paragraph 2 by amendment 96/2026, several references still say “paragraph 2”, although the description of the holder-investor has moved to paragraph 3. The source text has not been silently renumbered; for the specific scope also use the unambiguous Article 28 and require legal clarification.
Original Serbian quotation
„Инвеститор нема обавезу да прибави локацијске услове у случају када изводи радове на инвестиционом одржавању објекта и уклањању препрека за особе са инвалидитетом, радове којима се не мења спољни изглед, не повећава број функционалних јединица и капацитет инсталација, када врши адаптацију, санацију, грађење зиданих ограда, као и у свим осталим случајевима извођења радова којима се не врши прикључење на комуналну инфраструктуру, односно не мењају капацитети и функционалност постојећих прикључака на инфраструктурну мрежу, као и у случају грађења соларне електране до 1 МW за сопствене потребе у оквиру привредно-индустријског комплекса, без могућности даље испоруке на дистрибутивни систем односно део дистрибутивног система, укључујући и радове на премештању постојећег прикључка, ако се ти радови изводе искључиво за потребе те електране, осим у случајевима за које је Законом, прописано другачије.
Уз захтев за издавање решења о одобрењу за извођење радова, односно решења о грађевинској дозволи, за извођење радова на изградњи објекта соларне електране до 1 МW из става 1. овог члана, инвеститор је у обавези да достави све потребне услове и сагласности изван обједињене процедуре који су прописани посебним законима.
Ималац јавних овлашћења који је истовремено и инвеститор радова на реконструкцији, санацији и адаптацији постојеће инфраструктуре, изградњи прикључака на постојећу водоводну, канализациону, гасну и сл. мрежу, типских топловодних прикључака, привода за електронске комуникације и дела електродистрибутивне мреже од трансформаторске станице, односно дела мреже, до места прикључка на објекту купца, за које се издаје решење из члана 145. Закона, подноси захтев за издавање решења из члана 145. Закона, уз који прилаже услове за пројектовање и прикључење, укрштање и паралелно вођење од свих управљача инсталација водова на траси предметног објекта, у складу са одредбом члана 28. ове уредбе, без претходно прибављених локацијских услова.
Изузетно, ако је реч о објектима из члана 133. Закона, у случају из става 2. овог члана не прибављају се услови за прикључење на дистрибутивни систем електричне енергије.
У случају из става 2. овог члана, ималац јавних овлашћења који је и инвеститор радова уз захтев за издавање решења из члана 145. Закона, поред услова из става 2. овог члана, прилаже и одлуку органа надлежног за послове заштите животне средине о томе да ли је у вези са изградњом објекта или извођењем радова потребно покренути поступак процене утицаја на животну средину, односно ако је потребно покренути поступак процене утицаја на животну средину студију о процени утицаја на животну средину и сагласност на студију о процени утицаја на животну средину, као и изјаву инвеститора и одговорног пројектанта, којом потврђују да је приложена документација усаглашена са мерама и условима заштите животне средине.
У случају из става 2. овог члана, ималац јавних овлашћења који је и инвеститор радова, уз захтев за издавање решења из члана 145. Закона, поред услова из става 2. овог члана, прилаже и услове у погледу мера заштите од пожара и експлозија, у складу са чланом 20. ове уредбе, које прибавља ван обједињене процедуре, када се ради о реконструкцији постојеће инфраструктурне мреже са запаљивим и горивим течностима, као и о запаљивим гасовима, односно изградњи прикључка на ове мреже.
У случају радова у вези са непокретним културним добром и добром под претходном заштитом за које се издаје решење из члана 145. Закона, прибављају се услови за предузимање мера техничке заштите и других радова за непокретна културна добра и добра под претходном заштитом, које подносилац захтева може прибавити и ван обједињене процедуре.
У случају радова у границама националног парка и објеката у границама заштите заштићеног подручја од изузетног значаја за које се издаје решење из члана 145. Закона прибављају се услови заштите природе.
2. Postupak i način izdavanja lokacijskih uslova
Pokretanje postupka za izdavanje lokacijskih uslova i provera ispunjenosti formalnih uslova za postupanje po zahtevu
…
Za građenje objekata linijske i komunalne infrastrukture, pribavljaju se uslovi za projektovanje i priključenje, ukrštanje i paralelno vođenje od svih imalaca javnih ovlašćenja koji su upravljači vodova na trasi predmetnog objekta, kao i od drugih upravljača vodova na trasi predmetnog objekta koji su upisani u katastar vodova.
Imalac javnih ovlašćenja koji je istovremeno i investitor radova na rekonstrukciji, sanaciji i adaptaciji postojeće infrastrukture, izgradnji priključaka na postojeću vodovodnu, kanalizacionu, gasnu i sl. mrežu, naftovode i produktovode, tipskih toplovodnih priključaka, privoda za elektronske komunikacije i dela elektrodistributivne mreže od transformatorske stanice, odnosno dela mreže, do mesta priključka na objektu kupca, za koje se izdaje rešenje iz člana 145. Zakona, podnosi zahtev za izdavanje rešenja iz člana 145. Zakona, uz koji prilaže uslove za projektovanje i priključenje, ukrštanje i paralelno vođenje od svih upravljača instalacija vodova na trasi predmetnog objekta, a bez prethodno pribavljenih lokacijskih uslova.
Izuzetno, ako je reč o objektima iz člana 133. Zakona, u slučaju iz stava 2. ovog člana ne pribavljaju se uslovi za priključenje na distributivni sistem električne energije.
Imalac javnih ovlašćenja koji je i investitor radova na priključku na komunalnu i drugu infrastrukturu za koje se izdaje rešenje iz člana 145. Zakona nije obavezan da pribavi lokacijske uslove ako bi se uslovi za projektovanje i priključenje pribavljali samo od imaoca javnog ovlašćenja koji je ujedno i investitor.
Rešenje iz člana 145. Zakona za izgradnju priključka na komunalnu i drugu infrastrukturu izdaje se na osnovu lokacijskih uslova izdatih za objekat koji se priključuje na mrežu, ako ti lokacijski uslovi sadrže uslove za izvođenje priključka za koji je podnet zahtev za izdavanje rešenja iz člana 145. Zakona.
Nadležni organ će pribaviti uslove za projektovanje i priključenje, odnosno ukrštanje i paralelno vođenje i u drugim slučajevima propisanim zakonom, odnosno predviđenim planskim dokumentom ili separatom.
Izuzetno, neće se pribavljati uslovi za projektovanje i priključenje, koji se odnose na telekomunikacije i elektronske komunikacije, već isključivo uslovi za ukrštanje i paralelno vođenje.
IV SADRŽINA, POSTUPAK I NAČIN IZDAVANJA USLOVA ZA PROJEKTOVANJE I PRIKLJUČENJE OD STRANE IMAOCA JAVNIH OVLAŠĆENJA
1. Sadržina uslova za projektovanje i priključenje koje izdaju imaoci javnih ovlašćenja”
Informational English translation of the quotation
The investor is not obliged to obtain location conditions when carrying out investment maintenance works on a structure and removing barriers for persons with disabilities, works that do not change the exterior appearance and do not increase the number of functional units or the capacity of installations, when carrying out adaptation, rehabilitation, construction of masonry fences, as well as in all other cases of works that do not involve connection to utility infrastructure or change the capacity and functionality of existing connections to the infrastructure network, as well as when constructing a solar power plant of up to 1 MW for own needs within an economic and industrial complex, without the possibility of further supply to the distribution system or part of the distribution system, including works to relocate an existing connection, if those works are performed exclusively for that power plant, except where the Law provides otherwise.
With the application for a decision approving execution of works or a construction permit decision, for works to construct a solar power plant of up to 1 MW referred to in paragraph 1 of this Article, the investor must submit all necessary conditions and approvals prescribed by special laws, outside the unified procedure.
A holder of public powers who is also the investor in works on reconstruction, rehabilitation and adaptation of existing infrastructure, construction of connections to existing water supply, sewerage, gas and similar networks, standard district heating connections, electronic communications leads and the part of the electricity distribution network from the transformer station, or part of the network, to the connection point at the customer's structure, for which a decision under Article 145 of the Law is issued, submits an application for a decision under Article 145 of the Law, attaching design and connection, crossing and parallel routing conditions from all managers of utility installations along the route of the structure concerned, in accordance with Article 28 of this decree, without previously obtaining location conditions.
Exceptionally, for structures referred to in Article 133 of the Law, in the case referred to in paragraph 2 of this Article, conditions for connection to the electricity distribution system are not required.
In the case referred to in paragraph 2 of this Article, the holder of public powers who is also the investor in the works, in addition to the conditions referred to in paragraph 2 of this Article, attaches to the application for a decision under Article 145 of the Law a decision of the authority responsible for environmental protection on whether an environmental impact assessment procedure needs to be initiated in connection with the construction of the structure or execution of works, or, if such a procedure needs to be initiated, an environmental impact assessment study and approval of that study, as well as a statement by the investor and the responsible designer confirming that the attached documentation complies with environmental protection measures and conditions.
In the case referred to in paragraph 2 of this Article, the holder of public powers who is also the investor in the works, in addition to the conditions referred to in paragraph 2 of this Article, attaches to the application for a decision under Article 145 of the Law conditions concerning fire and explosion protection measures, in accordance with Article 20 of this decree, obtained outside the unified procedure, when reconstructing an existing infrastructure network with flammable and combustible liquids or flammable gases, or constructing a connection to those networks.
For works concerning immovable cultural property and property under preliminary protection for which a decision under Article 145 of the Law is issued, conditions for undertaking technical protection measures and other works on immovable cultural property and property under preliminary protection are obtained; the applicant may also obtain them outside the unified procedure.
For works within the boundaries of a national park and structures within the protected boundaries of a protected area of exceptional importance for which a decision under Article 145 of the Law is issued, nature protection conditions are obtained.
2. Procedure and method for issuing location conditions
Initiation of the procedure for issuing location conditions and checking compliance with the formal requirements for processing the application
…
For construction of linear and utility infrastructure structures, design and connection, crossing and parallel routing conditions are obtained from all holders of public powers who manage utility lines along the route of the structure concerned, as well as from other utility line managers along that route who are entered in the utility cadastre.
A holder of public powers who is also the investor in works on reconstruction, rehabilitation and adaptation of existing infrastructure, construction of connections to existing water supply, sewerage, gas and similar networks, oil pipelines and product pipelines, standard district heating connections, electronic communications leads and the part of the electricity distribution network from the transformer station, or part of the network, to the connection point at the customer's structure, for which a decision under Article 145 of the Law is issued, submits an application for a decision under Article 145 of the Law, attaching design and connection, crossing and parallel routing conditions from all managers of utility installations along the route of the structure concerned, without previously obtaining location conditions.
Exceptionally, for structures referred to in Article 133 of the Law, in the case referred to in paragraph 2 of this Article, conditions for connection to the electricity distribution system are not required.
A holder of public powers who is also the investor in works on a connection to utility and other infrastructure for which a decision under Article 145 of the Law is issued is not obliged to obtain location conditions if the design and connection conditions would be obtained only from the holder of public powers who is also the investor.
A decision under Article 145 of the Law for construction of a connection to utility and other infrastructure is issued on the basis of location conditions issued for the structure being connected to the network, if those location conditions contain the conditions for constructing the connection for which the application for a decision under Article 145 of the Law was submitted.
The competent authority shall also obtain design and connection, or crossing and parallel routing conditions in other cases prescribed by law or provided for in a planning document or separate conditions document (separat).
Exceptionally, design and connection conditions relating to telecommunications and electronic communications shall not be obtained; only crossing and parallel routing conditions shall be obtained.
IV CONTENT, PROCEDURE AND METHOD OF ISSUING DESIGN AND CONNECTION CONDITIONS BY HOLDERS OF PUBLIC POWERS
1. Content of design and connection conditions issued by holders of public powersInformational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Da li solarna elektrana do 1 MW bez lokacijskih uslova ipak zahtijeva posebne uslove i saglasnosti?Da. Za solarnu elektranu do 1 MW iz člana 5 stav 1, za sopstvene potrebe u privredno-industrijskom kompleksu bez dalje isporuke…
- How are documents exchanged when obtaining location conditions?Acts and documentation exchanged between the authority and the holder when obtaining location conditions (LU) are exchanged…
- Na koga glase LU i koliko IDR obavezuje dalju razradu?LU glase na parcele, ne ime podnosioca. Sadrže spisak uslova sa izdavaocem/brojem/datumom i listu obaveznih ugovora sa fazom…
- Šta LU moraju navesti za nedostajuću infrastrukturu i priključenje proizvodnje na prenos?Kada imalac utvrdi da bez nove/dograđene infrastrukture ili opremanja nije moguća gradnja, LU navode da nema faktičkih uslova i…
- Who may use issued location conditions?Location conditions may be used by any person who meets the conditions for a construction permit or a decision under Article 145…
- Can different location conditions be issued for the same cadastral parcel?At the request of one or more applicants, several different location conditions may be issued for the same cadastral parcel, in…