Procedures and documentation
What information does the authority provide to holders of public powers?
Answer
Informational English translation. Machine translated; not independently reviewed.
If a particular holder of public powers needs location information obtained ex officio to prepare conditions, the authority provides it with the request, including the information exhaustively listed in Article 12.
Original Serbian quotation
„Ako je za izradu uslova za projektovanje i priključenje konkretnom imaocu javnih ovlašćenja potrebna informacija o lokaciji, koja se pribavlja po službenoj dužnosti, nadležni organ je dostavlja uz zahtev iz člana 9. stav 1. ove uredbe, a ta informacija sadrži i podatke o: 1) planskom dokumentu na osnovu koga se izdaje; 2) celini, odnosno zoni u kojoj se nalazi; 3) nameni zemljišta; 4) regulacionim i građevinskim linijama; 5) pravilima građenja; 6) uslovima priključenja na infrastrukturu; 7) katastarskoj parceli, odnosno o tome da li postojeća katastarska parcela ispunjava uslove za građevinsku parcelu sa uputstvom o potrebnom postupku za formiranje građevinske parcele; 8) inženjersko-geološkim uslovima; 9) posebnim uslovima potrebnim za izdavanje lokacijskih uslova.”
Informational English translation of the quotation
If a particular holder of public powers needs location information, obtained ex officio, to prepare design and connection conditions, the competent authority provides it with the request referred to in Article 9 paragraph 1 of this decree, and that information also contains details of: 1) the planning document on the basis of which it is issued; 2) the unit or zone in which it is located; 3) land use; 4) regulation and building lines; 5) construction rules; 6) infrastructure connection conditions; 7) the cadastral parcel, namely whether the existing cadastral parcel meets the requirements for a building parcel, with instructions on the procedure needed to form a building parcel; 8) engineering and geological conditions; 9) special conditions necessary for issuing location conditions.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Da li solarna elektrana do 1 MW bez lokacijskih uslova ipak zahtijeva posebne uslove i saglasnosti?Da. Za solarnu elektranu do 1 MW iz člana 5 stav 1, za sopstvene potrebe u privredno-industrijskom kompleksu bez dalje isporuke…
- How are documents exchanged when obtaining location conditions?Acts and documentation exchanged between the authority and the holder when obtaining location conditions (LU) are exchanged…
- Na koga glase LU i koliko IDR obavezuje dalju razradu?LU glase na parcele, ne ime podnosioca. Sadrže spisak uslova sa izdavaocem/brojem/datumom i listu obaveznih ugovora sa fazom…
- Šta LU moraju navesti za nedostajuću infrastrukturu i priključenje proizvodnje na prenos?Kada imalac utvrdi da bez nove/dograđene infrastrukture ili opremanja nije moguća gradnja, LU navode da nema faktičkih uslova i…
- Who may use issued location conditions?Location conditions may be used by any person who meets the conditions for a construction permit or a decision under Article 145…
- Can different location conditions be issued for the same cadastral parcel?At the request of one or more applicants, several different location conditions may be issued for the same cadastral parcel, in…