When is the investor not required to obtain location conditions?
Answer
Informational English translation. Machine translated; not independently reviewed.
Location conditions are not required for works listed in Article 5, including capital maintenance, removal of barriers for persons with disabilities, certain works without changes to appearance, units or capacity, adaptation, remediation and masonry fences, subject to statutory exceptions. A separate exception applies to a solar power plant of up to 1 MW for own use within an economic and industrial complex without further supply to the distribution system; it does not mean exemption from a permit and special conditions.
Original Serbian quotation
„Инвеститор нема обавезу да прибави локацијске услове у случају када изводи радове на инвестиционом одржавању објекта и уклањању препрека за особе са инвалидитетом, радове којима се не мења спољни изглед, не повећава број функционалних јединица и капацитет инсталација, када врши адаптацију, санацију, грађење зиданих ограда, као и у свим осталим случајевима извођења радова којима се не врши прикључење на комуналну инфраструктуру, односно не мењају капацитети и функционалност постојећих прикључака на инфраструктурну мрежу, као и у случају грађења соларне електране до 1 МW за сопствене потребе у оквиру привредно-индустријског комплекса, без могућности даље испоруке на дистрибутивни систем односно део дистрибутивног система, укључујући и радове на премештању постојећег прикључка, ако се ти радови изводе искључиво за потребе те електране, осим у случајевима за које је Законом, прописано другачије.”
Informational English translation of the quotation
The investor is not required to obtain location conditions when carrying out capital maintenance of a structure and removing barriers for persons with disabilities, works that do not change the external appearance or increase the number of functional units and installation capacity, when carrying out adaptation, remediation, construction of masonry fences, and in all other cases of works that do not involve connection to utility infrastructure or change the capacity and functionality of existing connections to the infrastructure network, as well as when constructing a solar power plant of up to 1 MW for own use within an economic and industrial complex, without the possibility of further supply to the distribution system or part of the distribution system, including works to relocate an existing connection if those works are carried out exclusively for that power plant, except in cases for which the Law provides otherwise.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Da li solarna elektrana do 1 MW bez lokacijskih uslova ipak zahtijeva posebne uslove i saglasnosti?Da. Za solarnu elektranu do 1 MW iz člana 5 stav 1, za sopstvene potrebe u privredno-industrijskom kompleksu bez dalje isporuke…
- Koji posebni ekološki/požarni/kulturni uslovi ostaju u posebnom režimu bez LU ?Tekst čl. 5 uređuje EIA odluku/studiju/saglasnost sa izjavom investitora/projektanta, vanprocedure požarne uslove za…
- How are documents exchanged when obtaining location conditions?Acts and documentation exchanged between the authority and the holder when obtaining location conditions (LU) are exchanged…
- Na koga glase LU i koliko IDR obavezuje dalju razradu?LU glase na parcele, ne ime podnosioca. Sadrže spisak uslova sa izdavaocem/brojem/datumom i listu obaveznih ugovora sa fazom…
- Šta LU moraju navesti za nedostajuću infrastrukturu i priključenje proizvodnje na prenos?Kada imalac utvrdi da bez nove/dograđene infrastrukture ili opremanja nije moguća gradnja, LU navode da nema faktičkih uslova i…
- Who may use issued location conditions?Location conditions may be used by any person who meets the conditions for a construction permit or a decision under Article 145…