CEOP — formal requirements and corrected applications
How many times can I exercise the right to submit a compliant application without paying the administrative fee again and without resubmitting documentation already submitted?
Answer
Informational English translation. Machine translated; not independently reviewed.
The benefit of a compliant application without resubmitting documentation and fees and charges already paid may be used only once in the relevant procedure. The deadline and conditions depend on the stage. For location conditions, Article 8 of the Rulebook states 30 working days, while the current ZPI Article 8đ, paragraph 7 prescribes no later than 30 days; the figure in the subordinate regulation is not evidence of an extension of the statutory deadline.
Note: Article 27 expressly governs the benefit for a decision under Article 145, whereas Article 28 governs amendment of that decision. The number of uses of the benefit differs from the number of all possible new applications.
Original Serbian quotation
„Ako nisu ispunjeni formalni uslovi za dalje postupanje po zahtevu, propisani članom 7. ovog pravilnika, odnosno ako se za predmetnu izgradnju ili izvođenje radova ne pribavljaju lokacijski uslovi, organ kome je podnet zahtev za izdavanje lokacijskih uslova i usaglašeni zahtev za izdavanje lokacijskih uslova će zahtev odbaciti zaključkom uz navođenje svih nedostataka, odnosno razloga za odbacivanje (taksativno navodi svaki od nedostajućih podataka u zahtevu, odnosno svaki od nedostajućih priloga, kao i nedostatke priloga koji su podneti uz zahtev).
Organ kome je podnet zahtev, će zahtev za izdavanje lokacijskih uslova i usaglašeni zahtev za izdavanje lokacijskih uslova odbaciti zaključkom i ako idejno rešenje ne sadrži podatke potrebne za izdavanje lokacijskih uslova, uz navođenje svih nedostataka, odnosno razloga za odbacivanje, ne upuštajući se u ocenu tehničke dokumentacije u skladu sa odredbom člana 8đ Zakona.
Izuzetno od stava 1. ovog člana nadležni organ neće odbaciti zahtev za izdavanje lokacijskih uslova ako je podnosilac u zahtevu pogrešno uneo klasu i namenu objekta, već će te podatke ispraviti kroz CIS, na osnovu idejnog rešenja dostavljenog uz zahtev.
Protiv zaključka iz st. 1. i 2. ovog člana podnosilac zahteva može izjaviti prigovor nadležnom opštinskom, odnosno gradskom veću, preko nadležnog organa, u roku od tri dana od dana dostavljanja.
Ako je zaključak iz st. 1. i 2. ovog člana donelo Ministarstvo, odnosno nadležni organ autonomne pokrajine, prigovor se izjavljuje Vladi, odnosno izvršnom organu autonomne pokrajine, preko nadležnog ministarstva, odnosno nadležnog organa autonomne pokrajine.
Ako podnosilac zahteva u roku od 30 radnih dana od dana objavljivanja akta iz st. 1. i 2. ovog člana, podnese usaglašeni zahtev i otkloni sve utvrđene nedostatke, ne dostavlja dokumentaciju podnetu uz zahtev koji je odbačen, niti ponovo plaća administrativnu taksu za podnošenje zahteva i naknadu iz člana 6. stav 2. tačka 2) ovog pravilnika.
Podnosilac zahteva može samo jednom iskoristiti pravo na podnošenje usaglašenog zahteva bez obaveze dostavljanja dokumentacije podnete uz zahtev koji je odbačen i ponovnog plaćanja administrativne takse za podnošenje zahteva i naknade navedenih u članu 6. stav 2. tačka 2) ovog pravilnika.
Ako uz usaglašeni zahtev iz stava 6. ovog člana podnosilac dostavi izmenjen dokument u odnosu na dokument koji je već dostavio uz odbačeni zahtev, nadležni organ će postupati po tom izmenjenom dokumentu.
Ako zbog izmenjenog dokumenta nastupi dodatni formalni nedostatak koji je razlog za odbacivanje zahteva, podnosilac ne može ponovo koristiti pravo iz stava 6. ovog člana.
Ako podnosilac zahteva usaglašeni zahtev iz stava 6. ovog člana podnosi kako bi dostavio idejno rešenje izmenjeno u skladu sa razlozima navedenim u zaključku kojim je inicijalni zahtev odbačen, nadležni organ ponovo pribavlja samo one uslove za projektovanje i priključenje za koje su izmenama idejnog rešenja promenjeni bitni elementi za njihovo utvrđivanje.
Ako nadležni organ, u slučaju iz stava 10. ovog člana, ponovo zatraži uslove za projektovanje i priključenje zato što sumnja da su izmenama idejnog rešenja promenjeni bitni elementi za njihovo utvrđivanje, imalac javnih ovlašćenja kome su ti uslovi ponovo traženi ima pravo na ponovnu naplatu naknade za njihovu izradu, samo ako su izmenama idejnog rešenja bitni elementi za utvrđenje tih uslova zaista i promenjeni.
Ako se usled greške imaoca javnih ovlašćenja u uslovima za projektovanje i priključenje, nadležni organ ponovo bude obraćao za izdavanje uslova, imalac javnih ovlašćenja nema pravo na naplatu naknade za izradu takvih uslova.
Pribavljanje podataka od organa nadležnog za poslove državnog premera i katastra
…
Ako nisu ispunjeni uslovi za dalje postupanje po zahtevu, propisani Zakonom i članom 17. ovog pravilnika, nadležni organ zahtev odbacuje rešenjem, u roku od pet radnih dana od dana podnošenja zahteva, uz navođenje svih nedostataka.
Ako podnosilac zahteva u roku od 30 dana od dana objavljivanja rešenja iz stava 1. ovog člana, podnese usaglašen zahtev i otkloni sve nedostatke, ne dostavlja dokumentaciju podnetu uz zahtev koji je odbačen, niti ponovo plaća administrativne takse i naknadu navedene u članu 16. stav 2. tačka 5) ovog pravilnika.
Podnosilac zahteva može samo jednom iskoristiti pravo na podnošenje usaglašenog zahteva bez obaveze dostavljanja dokumentacije podnete uz zahtev koji je odbačen i ponovnog plaćanja administrativne takse za podnošenje zahteva i naknade iz člana 16. stav 2. tačka 5) ovog pravilnika.
Ako nadležni organ u postupku po usaglašenom zahtevu iz stava 2. ovog člana, zahtevu ne odobri izgradnju objekta, odnosno izvođenje radova, podnosilac zahteva ima pravo na povraćaj republičke administrativne takse za donošenje rešenja, iz člana 16. stav 2. tačka 5) ovog pravilnika, odnosno da tu taksu upotrebi u ponovljenom postupku.
Ako uz usaglašeni zahtev iz stava 2. ovog člana podnosilac dostavi izmenjen dokument u odnosu na dokument koji je već dostavio uz odbačeni zahtev, nadležni organ će postupati po tom izmenjenom dokumentu.
Ako zbog izmenjenog dokumenta nastupi dodatni formalni nedostatak koji je razlog za odbacivanje zahteva, podnosilac ne može ponovo koristiti pravo iz stava 2. ovog člana.
Ako podnosilac zahteva nije ispravio nedostatke u usaglašenom zahtevu, odnosno ako su utvrđeni dodatni formalni nedostaci u slučaju iz stava 5. ovog člana, nadležni organ će doneti rešenje o odbacivanju zahteva.
Rok za donošenje rešenja o građevinskoj dozvoli i dostava rešenja
…
Po prijemu zahteva za izdavanje rešenja iz člana 26. ovog pravilnika, nadležni organ proverava ispunjenost formalnih uslova za postupanje po tom zahtevu, odnosno proverava da li je:
1) nadležan za izdavanje rešenja za koje je podnet zahtev;
2) kao podnosilac zahteva označen investitor odnosno finansijer;
3) zahtev podnet u propisanoj formi i da li zahtev i idejni projekat podnet uz zahtev, sadrži sve propisane podatke;
4) za izvođenje predmetnih radova potrebno pribavljanje lokacijskih uslova i ukoliko jeste da li je investitor prethodno pribavio lokacijske uslove, odnosno da li je u skladu sa članom 26. stav 2. tač. 7)-9) ovog pravilnika dostavio sve uslove za ukrštanje i paralelno vođenje, odnosno uslove u pogledu mera zaštite od požara i eksplozija, ako su pribavljeni van objedinjene procedure, te da li je dostavio izjavu glavnog projektanta da je idejni projekat usklađen sa tim uslovima;
5) priložena sva dokumentacija propisana Zakonom i podzakonskim aktima donetim na osnovu Zakona;
6) uz zahtev priložen dokaz o uplati administrativnih taksi i naknade iz člana 26. stav 2. tačka 3) ovog pravilnika.
Pored ispunjenosti formalnih uslova iz stava 1. ovog člana, nadležni organ proverava i:
1) usklađenost zahteva sa planskim dokumentom, odnosno separatom, osim u slučaju izgradnje ili dogradnje sekundarne mreže komunalne i druge infrastrukture u regulaciji postojeće saobraćajnice, izgradnje priključaka na tu infrastrukturu, kao i rekonstrukcije, adaptacije i sanacije javnih saobraćajnih i drugih javnih površina u postojećoj regulaciji;
2) usklađenost zahteva sa lokacijskim uslovima, u slučaju izvođenja radova za koje je potrebno pribaviti uslove za projektovanje i priključenje od strane imaoca javnih ovlašćenja.
Kada je to propisano Zakonom, nadležni organ utvrđuje postojanje odgovarajućeg prava na zemljištu, odnosno objektu, shodnom primenom odredbi koje se odnose na pribavljanje lista nepokretnosti u postupku izdavanja građevinske dozvole iz člana 17. stav 4. ovog pravilnika.
Ako utvrdi da su ispunjeni uslovi iz st. 1-3. ovog člana, nadležni organ donosi rešenje u skladu sa članom 145. Zakona, u roku od pet radnih dana od dana podnošenja zahteva.
Rešenje iz stava 4. ovog člana nadležni organ, dostavlja podnosiocu zahteva bez odlaganja kroz CIS, a najkasnije u roku od tri dana od dana donošenja, a rešenje dostavlja i:
1) inspekciji koja vrši nadzor nad izgradnjom objekta;
2) jedinici lokalne samouprave na čijoj se teritoriji gradi objekat, ako je rešenje izdalo ministarstvo, odnosno autonomna pokrajina, radi informisanja;
3) imaocima javnih ovlašćenja nadležnim za utvrđivanje uslova za projektovanje, odnosno priključenje objekata na infrastrukturnu mrežu, radi informisanja.
Ako utvrdi da nisu ispunjeni uslovi iz st. 1-3. ovog člana nadležni organ zahtev odbacuje rešenjem, u roku od pet radnih dana od dana podnošenja zahteva, uz navođenje svih nedostataka.
Nadležni organ odbiće rešenjem zahtev ako je za radove navedene u zahtevu potrebno izdavanje građevinske dozvole, u roku od pet radnih dana od dana podnošenja zahteva.
Za izvođenje radova iz člana 145. Zakona za koje je propisana obaveza plaćanja doprinosa za uređivanje građevinskog zemljišta, rešenjem o odobrenju izvođenja radova utvrđuje se i iznos i način plaćanja doprinosa za uređivanje građevinskog zemljišta, sredstvo obezbeđenja u slučaju plaćanja na rate, kao i obaveza investitora da pre početka izvođenja radova izvrši plaćanje doprinosa u celosti, odnosno da u slučaju plaćanja na rate dostavi sredstvo obezbeđenja i uplati prvu ratu.
Ako podnosilac zahteva najkasnije 30 dana od dana objavljivanja rešenja iz stava 6. ovog člana, podnese usaglašen zahtev i otkloni sve nedostatke, ne dostavlja ponovo dokumentaciju podnetu uz zahtev koji je odbačen, niti ponovo plaća administrativne takse i naknadu iz člana 26. stav 2. tačka 3) ovog pravilnika.
Podnosilac zahteva može samo jednom iskoristiti pravo na podnošenje usaglašenog zahteva bez obaveze dostavljanja dokumentacije podnete uz zahtev koji je odbačen i ponovnog plaćanja administrativne takse za podnošenje zahteva i naknade iz člana 26. stav 2. tačka 3) ovog pravilnika.
Ako nadležni organ u postupku po zahtevu ne odobri izvođenje radova, podnosilac zahteva ima pravo na povraćaj republičke administrativne takse za donošenje rešenja, navedene u članu 26. stav 2. tačka 3) ovog pravilnika, odnosno da tu taksu upotrebi u ponovljenom postupku.
Ako uz usaglašeni zahtev iz stava 9. ovog člana podnosilac dostavi izmenjen dokument u odnosu na dokument koji je već dostavio uz zahtev iz stava 6. ovog člana, nadležni organ će postupati po tom izmenjenom dokumentu. Ako zbog izmenjenog dokumenta nastupi dodatni formalni nedostatak koji je razlog za odbacivanje zahteva, podnosilac ne može ponovo koristiti pravo iz stava 9. ovog člana.
Ako podnosilac zahteva nije ispravio nedostatke u usaglašenom zahtevu, odnosno ako su utvrđeni dodatni formalni nedostaci u slučaju iz stava 12. ovog člana, nadležni organ će doneti rešenje o odbacivanju zahteva.
Na pravo na žalbu, odnosno tužbu upravnom sudu na odluke iz st. 4, 6-7. i 14. ovog člana shodno se primenjuju odredbe ovog pravilnika koje uređuju pravo na žalbu, odnosno pokretanje upravnog spora iz člana 21. ovog pravilnika.
…
Ako nisu ispunjeni formalni uslovi za dalje postupanje po zahtevu, propisani članom 44. ovog pravilnika, nadležni organ zahtev odbacuje rešenjem, u roku od pet radnih dana od dana podnošenja zahteva, uz navođenje razloga za takvu odluku.
Ako podnosilac zahteva u roku od 30 dana od dana objavljivanja rešenja iz stava 1. ovog člana podnese usaglašeni zahtev i otkloni sve utvrđene nedostatke, ne dostavlja dokumentaciju podnetu uz zahtev koji je odbačen, niti ponovo plaća administrativne takse i naknade navedene u članu 43. stav 2. tačka 6) ovog pravilnika.
Podnosilac zahteva može samo jednom iskoristiti pravo na podnošenje usaglašenog zahteva bez obaveze dostavljanja dokumentacije podnete uz zahtev koji je odbačen i ponovnog plaćanja administrativne takse za podnošenje zahteva i naknada navedenih u članu 43. stav 2. tačka 6) ovog pravilnika.
Ako nadležni organ u postupku po zahtevu iz stava 2. ovog člana, ne dozvoli upotrebu objekta, podnosilac zahteva ima pravo na povraćaj republičke administrativne takse za donošenje rešenja, navedene u članu 43. stav 2. tačka 6) ovog pravilnika, odnosno da tu taksu upotrebi u ponovljenom postupku.
Ako uz usaglašeni zahtev iz stava 2. ovog člana podnosilac dostavi izmenjen dokument u odnosu na dokument koji je već dostavio uz odbačeni zahtev, nadležni organ će postupati po tom izmenjenom dokumentu. Ako zbog izmenjenog dokumenta nastupi dodatni formalni nedostatak koji je razlog za odbacivanje zahteva, podnosilac ne može ponovo koristiti pravo iz stava 2. ovog člana.
Ako podnosilac zahteva nije ispravio nedostatke u zahtevu iz stava 6. ovog člana, odnosno ako su utvrđeni dodatni formalni nedostaci u slučaju iz stava 5. ovog člana, nadležni organ će doneti rešenje o odbacivanju zahteva.
Rok za donošenje rešenja o upotrebnoj dozvoli i dostava rešenja”
Informational English translation of the quotation
If the formal conditions for further processing of the application prescribed by Article 7 of this Rulebook are not met, or if obtaining location conditions is not required for the construction or performance of works in question, the authority to which the application for location conditions and the compliant application for location conditions were submitted shall reject the application by an order stating all deficiencies or reasons for rejection (specifying exhaustively each missing item of information in the application or each missing attachment, as well as deficiencies in attachments submitted with the application).
The authority to which the application was submitted shall also reject the application for location conditions and the compliant application for location conditions by an order if the preliminary design does not contain the information needed to issue location conditions, stating all deficiencies or reasons for rejection, without assessing the technical documentation in accordance with Article 8đ of the Law.
By way of exception to paragraph 1 of this Article, the competent authority shall not reject an application for location conditions if the applicant has incorrectly entered the class and use of the structure in the application, but shall correct that information through CIS on the basis of the preliminary design submitted with the application.
The applicant may lodge an objection against the order referred to in paragraphs 1 and 2 of this Article with the competent municipal or city council through the competent authority within three days of service.
If the order referred to in paragraphs 1 and 2 of this Article was issued by the Ministry or the competent authority of the autonomous province, the objection shall be lodged with the Government or the executive body of the autonomous province through the competent ministry or competent authority of the autonomous province.
If the applicant submits a compliant application and remedies all identified deficiencies within 30 working days of publication of the act referred to in paragraphs 1 and 2 of this Article, the applicant shall not submit the documentation submitted with the rejected application or pay again the administrative application fee and the charge referred to in Article 6, paragraph 2, item 2) of this Rulebook.
The applicant may exercise the right to submit a compliant application without the obligation to submit documentation submitted with the rejected application and pay again the administrative application fee and charge referred to in Article 6, paragraph 2, item 2) of this Rulebook only once.
If the applicant submits with the compliant application referred to in paragraph 6 of this Article a document amended in relation to the document already submitted with the rejected application, the competent authority shall act on that amended document.
If the amended document gives rise to an additional formal deficiency constituting grounds for rejection of the application, the applicant may not exercise the right under paragraph 6 of this Article again.
If the applicant submits the compliant application referred to in paragraph 6 of this Article to provide a preliminary design amended in accordance with the reasons stated in the order rejecting the initial application, the competent authority shall obtain again only those design and connection conditions whose essential determining elements have changed due to the amendments to the preliminary design.
If, in the case referred to in paragraph 10 of this Article, the competent authority requests design and connection conditions again because it suspects that the amendments to the preliminary design have changed essential elements for determining them, the holder of public powers from whom those conditions are requested again is entitled to charge again for preparing them only if the essential elements for determining those conditions have actually changed due to the amendments to the preliminary design.
If, due to an error by the holder of public powers in the design and connection conditions, the competent authority again requests issuance of conditions, the holder of public powers is not entitled to charge for preparing such conditions.
Obtaining data from the authority responsible for state surveying and cadastre
…
If the conditions for further processing of the application prescribed by the Law and Article 17 of this Rulebook are not met, the competent authority shall reject the application by decision within five working days of submission, stating all deficiencies.
If the applicant submits a compliant application and remedies all deficiencies within 30 days of publication of the decision referred to in paragraph 1 of this Article, the applicant shall not submit documentation submitted with the rejected application or pay again the administrative fees and charge referred to in Article 16, paragraph 2, item 5) of this Rulebook.
The applicant may exercise the right to submit a compliant application without the obligation to submit documentation submitted with the rejected application and pay again the administrative application fee and charge referred to in Article 16, paragraph 2, item 5) of this Rulebook only once.
If, in proceedings on the compliant application referred to in paragraph 2 of this Article, the competent authority does not approve construction of the structure or performance of the works, the applicant is entitled to a refund of the republic administrative fee for issuance of the decision referred to in Article 16, paragraph 2, item 5) of this Rulebook, or to use that fee in a repeated procedure.
If the applicant submits with the compliant application referred to in paragraph 2 of this Article a document amended in relation to the document already submitted with the rejected application, the competent authority shall act on that amended document.
If the amended document gives rise to an additional formal deficiency constituting grounds for rejection of the application, the applicant may not exercise the right under paragraph 2 of this Article again.
If the applicant has not corrected the deficiencies in the compliant application, or if additional formal deficiencies have been identified in the case referred to in paragraph 5 of this Article, the competent authority shall issue a decision rejecting the application.
Deadline for issuing the building permit decision and service of the decision
…
Upon receiving an application for issuance of the decision referred to in Article 26 of this Rulebook, the competent authority checks whether the formal conditions for acting on the application are met, namely whether:
1) it has jurisdiction to issue the decision sought;
2) the investor or financier is identified as the applicant;
3) the application is submitted in the prescribed form and the application and preliminary project submitted with it contain all prescribed information;
4) location conditions must be obtained for performance of the works in question and, if so, whether the investor has previously obtained location conditions or, in accordance with Article 26, paragraph 2, items 7)–9) of this Rulebook, submitted all conditions for crossings and parallel routing or conditions regarding fire and explosion protection measures, if obtained outside the unified procedure, and whether the investor has submitted the lead designer's statement that the preliminary project complies with those conditions;
5) all documentation prescribed by the Law and subordinate regulations adopted under the Law is attached;
6) proof of payment of the administrative fees and charge referred to in Article 26, paragraph 2, item 3) of this Rulebook is attached to the application.
In addition to the formal conditions under paragraph 1 of this Article, the competent authority also checks:
1) compliance of the application with the planning document or separate document, except in the case of construction or extension of a secondary utility or other infrastructure network within the regulation line of an existing road, construction of connections to that infrastructure, and reconstruction, adaptation and rehabilitation of public traffic and other public areas within the existing regulation line;
2) compliance of the application with the location conditions, where works are performed for which design and connection conditions must be obtained from a holder of public powers.
Where prescribed by the Law, the competent authority establishes the existence of an appropriate right to the land or structure, applying correspondingly the provisions on obtaining the real estate folio in the building permit procedure under Article 17, paragraph 4 of this Rulebook.
If it finds that the conditions under paragraphs 1-3 of this Article are met, the competent authority shall issue a decision in accordance with Article 145 of the Law within five working days of submission of the application.
The competent authority shall deliver the decision referred to in paragraph 4 of this Article to the applicant without delay through CIS, and no later than three days after its issuance, and shall also deliver it to:
1) the inspectorate supervising construction of the structure;
2) the local self-government unit on whose territory the structure is being built, if the decision was issued by the ministry or autonomous province, for information;
3) holders of public powers responsible for determining design or infrastructure network connection conditions for structures, for information.
If it finds that the conditions under paragraphs 1-3 of this Article are not met, the competent authority shall reject the application by decision within five working days of submission, stating all deficiencies.
The competent authority shall refuse the application by decision within five working days of submission if a building permit is required for the works specified in the application.
For works under Article 145 of the Law for which payment of a contribution for development of construction land is prescribed, the decision approving the works also determines the amount and method of payment of that contribution, the security instrument in case of payment in instalments, and the investor's obligation to pay the contribution in full before works begin or, in case of payment in instalments, to provide the security instrument and pay the first instalment.
If the applicant submits a compliant application and remedies all deficiencies no later than 30 days after publication of the decision referred to in paragraph 6 of this Article, the applicant shall not resubmit documentation submitted with the rejected application or pay again the administrative fees and charge referred to in Article 26, paragraph 2, item 3) of this Rulebook.
The applicant may exercise the right to submit a compliant application without the obligation to submit documentation submitted with the rejected application and pay again the administrative application fee and charge referred to in Article 26, paragraph 2, item 3) of this Rulebook only once.
If the competent authority does not approve performance of the works in proceedings on the application, the applicant is entitled to a refund of the republic administrative fee for issuance of the decision referred to in Article 26, paragraph 2, item 3) of this Rulebook, or to use that fee in a repeated procedure.
If the applicant submits with the compliant application referred to in paragraph 9 of this Article a document amended in relation to the document already submitted with the application referred to in paragraph 6 of this Article, the competent authority shall act on that amended document. If the amended document gives rise to an additional formal deficiency constituting grounds for rejection of the application, the applicant may not exercise the right under paragraph 9 of this Article again.
If the applicant has not corrected the deficiencies in the compliant application, or if additional formal deficiencies have been identified in the case referred to in paragraph 12 of this Article, the competent authority shall issue a decision rejecting the application.
The provisions of this Rulebook governing the right to appeal or initiate an administrative dispute under Article 21 of this Rulebook apply correspondingly to the right to appeal or bring an action before the administrative court against decisions referred to in paragraphs 4, 6-7 and 14 of this Article.
…
If the formal conditions for further processing of the application prescribed by Article 44 of this Rulebook are not met, the competent authority shall reject the application by decision within five working days of submission, stating the reasons for that decision.
If the applicant submits a compliant application and remedies all identified deficiencies within 30 days of publication of the decision referred to in paragraph 1 of this Article, the applicant shall not submit documentation submitted with the rejected application or pay again the administrative fees and charges referred to in Article 43, paragraph 2, item 6) of this Rulebook.
The applicant may exercise the right to submit a compliant application without the obligation to submit documentation submitted with the rejected application and pay again the administrative application fee and charges referred to in Article 43, paragraph 2, item 6) of this Rulebook only once.
If the competent authority does not permit use of the structure in proceedings on the application referred to in paragraph 2 of this Article, the applicant is entitled to a refund of the republic administrative fee for issuance of the decision referred to in Article 43, paragraph 2, item 6) of this Rulebook, or to use that fee in a repeated procedure.
If the applicant submits with the compliant application referred to in paragraph 2 of this Article a document amended in relation to the document already submitted with the rejected application, the competent authority shall act on that amended document. If the amended document gives rise to an additional formal deficiency constituting grounds for rejection of the application, the applicant may not exercise the right under paragraph 2 of this Article again.
If the applicant has not corrected the deficiencies in the application referred to in paragraph 6 of this Article, or if additional formal deficiencies have been identified in the case referred to in paragraph 5 of this Article, the competent authority shall issue a decision rejecting the application.
Deadline for issuing the occupancy permit decision and service of the decisionInformational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- If technical documentation is submitted in DWF/DWFX/DWG, must a PDF also be provided?Yes. DWF/DWFX/DWG is permitted in prescribed cases, but a copy in PDF format, appropriately electronically signed, must also be…
- Is a CEOP application submitted and signed through CIS?Yes. The relevant application is completed through CIS and signed with the qualified electronic signature of the applicant or…
- In what format is a site plan submitted to CEOP?The site plan must also be submitted in DWG or DXF format, georeferenced in the national coordinate system, together with the…
- What must be attached when a CEOP application is submitted through an authorised representative?A power of attorney in electronic PDF form with a qualified electronic signature, or a properly digitised power of attorney…
- Kako se izdaje klauzula pravnosnažnosti i ispravlja greška akta?Donosilac po službenoj dužnosti ili zahtjevu stranke izdaje klauzulu pravnosnažnosti kao propisno elektronski sastavljenu…