Procedures and documentation
Which documents does the authority obtain from the cadastre?
Answer
Informational English translation. Machine translated; not independently reviewed.
When the formal/other conditions are met, the authority obtains ex officio without delay through CIS a copy of the plan for the parcels listed in the IDR and an extract from the utility cadastre, except for adding storeys to an existing structure. It does not obtain them if construction is impossible under the plan/separate conditions document/urban planning project. It checks area in the electronic database/Service Bus except for linear/antenna structures; the cadastre supplies the documents or enables inspection without delay.
Original Serbian quotation
„Ако су испуњени формални и други услови за даље поступање по захтеву, прописани чланом 6. ст. 2. и 4. ове уредбе, надлежни орган по службеној дужности, без одлагања, прибавља од органа надлежног за послове државног премера и катастра, електронским путем, кроз ЦИС, следеће документе издате у форми електронског документа:
1) копију плана за катастарску парцелу, односно катастарске парцеле наведене у списку катастарских парцела које су саставни део идејног решења и који се прилаже уз захтев за издавање локацијских услова;
2) извод из катастра водова, осим за извођење радова на надзиђивању постојећег објекта.
Kопију плана, односно извод из катастра водова надлежни орган не прибавља ако утврди да се објекат за који је поднет захтев не може градити по планском документу, односно сепарату и/или урбанистичком пројекту.
Тачност података о површини катастарске парцеле, односно катастарских парцела унет у захтев за издавање локацијских услова, надлежни орган утврђује увидом у званичну електронску базу података катастра непокретности, односно прибављањем тих података преко Сервисне магистрале органа, осим за линијске објекте и антенске стубове за које ти подаци нису релевантни.
Орган надлежан за послове државног премера и катастра дужан је да без одлагања, електронским путем, надлежном органу достави документе, односно омогући увид у складу са ст. 1. и 3. овог члана.
Издавање локацијских услова увидом у плански документ, односно сепарат”
Informational English translation of the quotation
If the formal and other conditions for further action on the application prescribed by Article 6 paragraphs 2 and 4 of this Regulation are met, the competent authority shall, ex officio and without delay, obtain electronically through CIS from the authority responsible for state survey and cadastre the following documents issued in electronic form:
1) a copy of the plan for the cadastral parcel or parcels listed in the list of cadastral parcels forming an integral part of the concept design and attached to the application for location conditions;
2) an extract from the utility cadastre, except for works to add storeys to an existing structure.
The competent authority does not obtain the copy of the plan or extract from the utility cadastre if it determines that the structure for which the application was submitted cannot be built under the planning document or separate conditions document (separat) and/or urban planning project.
The competent authority verifies the accuracy of data on the area of the cadastral parcel or parcels entered in the application for location conditions by inspecting the official electronic real estate cadastre database or obtaining the data through the authorities’ Service Bus, except for linear structures and antenna masts for which these data are irrelevant.
The authority responsible for state survey and cadastre must, without delay and electronically, deliver the documents to the competent authority or enable inspection in accordance with paragraphs 1 and 3 of this Article.
Issuance of location conditions by inspecting the planning document or separate conditions document (separat)Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- When does the authority not obtain cadastral documents?The authority does not obtain documents if it establishes that the structure cannot be built under the planning document or…
- Da li solarna elektrana do 1 MW bez lokacijskih uslova ipak zahtijeva posebne uslove i saglasnosti?Da. Za solarnu elektranu do 1 MW iz člana 5 stav 1, za sopstvene potrebe u privredno-industrijskom kompleksu bez dalje isporuke…
- How are documents exchanged when obtaining location conditions?Acts and documentation exchanged between the authority and the holder when obtaining location conditions (LU) are exchanged…
- Na koga glase LU i koliko IDR obavezuje dalju razradu?LU glase na parcele, ne ime podnosioca. Sadrže spisak uslova sa izdavaocem/brojem/datumom i listu obaveznih ugovora sa fazom…
- Šta LU moraju navesti za nedostajuću infrastrukturu i priključenje proizvodnje na prenos?Kada imalac utvrdi da bez nove/dograđene infrastrukture ili opremanja nije moguća gradnja, LU navode da nema faktičkih uslova i…
- Who may use issued location conditions?Location conditions may be used by any person who meets the conditions for a construction permit or a decision under Article 145…