Procedures and documentation
Who obtains information on the need for an impact assessment for location conditions?
Answer
Informational English translation. Machine translated; not independently reviewed.
The authority competent to issue location conditions obtains through CIS information from the environmental protection authority on the need to conduct an impact assessment procedure. That information forms part of the location conditions; it is neither the impact assessment study itself nor approval of it.
Original Serbian quotation
„Uslovi u pogledu zaštite prirode pribavljaju se u slučajevima kada je propisima o zaštiti prirode, planskim dokumentom, odnosno separatom predviđeno pribavljanje tih uslova.
Lokacijski uslovi sadrže informaciju o potrebi sprovođenja procedure procene uticaja na životnu sredinu u vezi sa izgradnjom objekta ili izvođenjem radova, za koje se izdaju lokacijski uslovi, koja se od organa nadležnog za poslove zaštite životne sredine pribavlja u objedinjenoj proceduri kroz CIS.”
Informational English translation of the quotation
Nature protection conditions are obtained where their acquisition is prescribed by nature protection regulations, the planning document or the separate conditions document (separat).
Location conditions contain information on the need to conduct an environmental impact assessment procedure in connection with construction of the structure or execution of works for which the location conditions are issued; this information is obtained from the authority competent for environmental protection in the unified procedure through CIS.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- When are nature protection conditions obtained?Nature protection conditions are obtained when provided for by nature protection regulations, the planning document or the…
- Da li solarna elektrana do 1 MW bez lokacijskih uslova ipak zahtijeva posebne uslove i saglasnosti?Da. Za solarnu elektranu do 1 MW iz člana 5 stav 1, za sopstvene potrebe u privredno-industrijskom kompleksu bez dalje isporuke…
- How are documents exchanged when obtaining location conditions?Acts and documentation exchanged between the authority and the holder when obtaining location conditions (LU) are exchanged…
- Na koga glase LU i koliko IDR obavezuje dalju razradu?LU glase na parcele, ne ime podnosioca. Sadrže spisak uslova sa izdavaocem/brojem/datumom i listu obaveznih ugovora sa fazom…
- Šta LU moraju navesti za nedostajuću infrastrukturu i priključenje proizvodnje na prenos?Kada imalac utvrdi da bez nove/dograđene infrastrukture ili opremanja nije moguća gradnja, LU navode da nema faktičkih uslova i…
- Who may use issued location conditions?Location conditions may be used by any person who meets the conditions for a construction permit or a decision under Article 145…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal