What requirements does the authority check for an application for approval of works?
Answer
Informational English translation. Machine translated; not independently reviewed.
The authority checks its jurisdiction, whether the applicant is the investor/funder, the form and prescribed information in the application/preliminary design (IDP), the required location conditions or conditions obtained outside the unified procedure and the lead designer's statement of compliance, all prescribed documentation and fees. It also checks compliance with the plan/separate conditions document (separat), subject to the exception for secondary infrastructure/connections and public areas within the existing regulation line specified in Article 27, and with the location conditions when conditions from public authority holders are required. It checks the appropriate right when prescribed by the Law.
Original Serbian quotation
„По пријему захтева за издавање решења из члана 26. овог правилника, надлежни орган проверава испуњеност формалних услова за поступање по том захтеву, односно проверава да ли је:
1) надлежан за издавање решења за које је поднет захтев;
2) као подносилац захтева означен инвеститор односно финансијер;
3) захтев поднет у прописаној форми и да ли захтев и идејни пројекат поднет уз захтев, садржи све прописане податке;
4) за извођење предметних радова потребно прибављање локацијских услова и уколико јесте да ли је инвеститор претходно прибавио локацијске услове, односно да ли је у складу са чланом 26. став 2. тач. 7)–9) овог правилника доставио све услове за укрштање и паралелно вођење, односно услове у погледу мера заштите од пожара и експлозија, ако су прибављени ван обједињене процедуре, те да ли је доставио изјаву главног пројектанта да је идејни пројекат усклађен са тим условима;
5) приложена сва документација прописана Законом и подзаконским актима донетим на основу Закона;
6) уз захтев приложен доказ о уплати административних такси и накнаде из члана 26. став 2. тачка 3) овог правилника.
Поред испуњености формалних услова из става 1. овог члана, надлежни орган проверава и:
1) усклађеност захтева са планским документом, односно сепаратом, осим у случају изградње или доградње секундарне мреже комуналне и друге инфраструктуре у регулацији постојеће саобраћајнице, изградње прикључака на ту инфраструктуру, као и реконструкције, адаптације и санације јавних саобраћајних и других јавних површина у постојећој регулацији;
2) усклађеност захтева са локацијским условима, у случају извођења радова за које је потребно прибавити услове за пројектовање и прикључење од стране имаоца јавних овлашћења.
Када је то прописано Законом, надлежни орган утврђује постојање одговарајућег права на земљишту, односно објекту, сходном применом одредби које се односе на прибављање листа непокретности у поступку издавања грађевинске дозволе из члана 17. став 4. овог правилника.
Ако утврди да су испуњени услови из ст. 1–3. овог члана, надлежни орган доноси решење у складу са чланом 145. Закона, у року од пет радних дана од дана подношења захтева.
Решење из става 4. овог члана надлежни орган, доставља подносиоцу захтева без одлагања кроз ЦИС, а најкасније у року од три дана од дана доношења, а решење доставља и:
1) инспекцији која врши надзор над изградњом објекта;
2) јединици локалне самоуправе на чијој се територији гради објекат, ако је решење издало министарство, односно аутономна покрајина, ради информисања;
3) имаоцима јавних овлашћења надлежним за утврђивање услова за пројектовање, односно прикључење објеката на инфраструктурну мрежу, ради информисања.
Ако утврди да нису испуњени услови из ст. 1–3. овог члана надлежни орган захтев одбацује решењем, у року од пет радних дана од дана подношења захтева, уз навођење свих недостатака.
Надлежни орган одбиће решењем захтев ако је за радове наведене у захтеву потребно издавање грађевинске дозволе, у року од пет радних дана од дана подношења захтева.
За извођење радова из члана 145. Закона за које је прописана обавеза плаћања доприноса за уређивање грађевинског земљишта, решењем о одобрењу извођења радова утврђује се и износ и начин плаћања доприноса за уређивање грађевинског земљишта, средство обезбеђења у случају плаћања на рате, као и обавеза инвеститора да пре почетка извођења радова изврши плаћање доприноса у целости, односно да у случају плаћања на рате достави средство обезбеђења и уплати прву рату.
Ако подносилац захтева најкасније 30 дана од дана објављивања решења из става 6. овог члана, поднесе усаглашен захтев и отклони све недостатке, не доставља поново документацију поднету уз захтев који је одбачен, нити поново плаћа административне таксе и накнаду из члана 26. став 2. тачка 3) овог правилника.
Подносилац захтева може само једном искористити право на подношење усаглашеног захтева без обавезе достављања документације поднете уз захтев који је одбачен и поновног плаћања административне таксе за подношење захтева и накнаде из члана 26. став 2. тачка 3) овог правилника.
Ако надлежни орган у поступку по захтеву не одобри извођење радова, подносилац захтева има право на повраћај републичке административне таксе за доношење решења, наведене у члану 26. став 2. тачка 3) овог правилника, односно да ту таксу употреби у поновљеном поступку.
Ако уз усаглашени захтев из става 9. овог члана подносилац достави измењен документ у односу на документ који је већ доставио уз захтев из става 6. овог члана, надлежни орган ће поступати по том измењеном документу. Ако због измењеног документа наступи додатни формални недостатак који је разлог за одбацивање захтева, подносилац не може поново користити право из става 9. овог члана.
…
Ако подносилац захтева није исправио недостатке у усаглашеном захтеву, односно ако су утврђени додатни формални недостаци у случају из става 12. овог члана, надлежни орган ће донети решење о одбацивању захтева.
На право на жалбу, односно тужбу управном суду на одлуке из ст. 4, 6–7. и 14. овог члана сходно се примењују одредбе овог правилника које уређују право на жалбу, односно покретање управног спора из члана 21. овог правилника.”
Informational English translation of the quotation
Upon receipt of an application for the issuance of a decision referred to in Article 26 of this Rulebook, the competent authority checks whether the formal requirements for processing that application are met, that is, whether:
1) it has jurisdiction to issue the decision applied for;
2) the investor or funder is identified as the applicant;
3) the application has been submitted in the prescribed form and whether the application and the preliminary design submitted with it contain all prescribed information;
4) location conditions must be obtained for the works in question and, if so, whether the investor has previously obtained them, or whether, in accordance with Article 26 paragraph 2 items 7)–9) of this Rulebook, the investor has submitted all conditions for crossings and parallel routing, or conditions concerning fire and explosion protection measures, if obtained outside the unified procedure, and whether the investor has submitted a statement by the lead designer that the preliminary design complies with those conditions;
5) all documentation prescribed by the Law and by secondary legislation adopted under the Law has been attached;
6) proof of payment of the administrative fees and the charge referred to in Article 26 paragraph 2 item 3) of this Rulebook has been attached to the application.
In addition to the formal requirements in paragraph 1 of this Article, the competent authority also checks:
1) whether the application complies with the planning document or separate conditions document (separat), except in the case of construction or extension of a secondary network of utility and other infrastructure within the regulation line of an existing road, construction of connections to that infrastructure, and reconstruction, adaptation and rehabilitation of public traffic and other public areas within the existing regulation line;
2) whether the application complies with the location conditions, in the case of works for which design and connection conditions must be obtained from a public authority holder.
When prescribed by the Law, the competent authority determines whether an appropriate right to the land or structure exists, applying accordingly the provisions concerning the acquisition of a real estate folio in the construction permit procedure under Article 17 paragraph 4 of this Rulebook.
If it finds that the requirements in paragraphs 1–3 of this Article are met, the competent authority issues a decision in accordance with Article 145 of the Law within five working days of submission of the application.
The competent authority delivers the decision referred to in paragraph 4 of this Article to the applicant without delay through CIS, and no later than three days after its issuance, and also delivers the decision to:
1) the inspectorate supervising construction of the structure;
2) the local government unit in whose territory the structure is being built, if the decision was issued by the ministry or the autonomous province, for information;
3) the public authority holders responsible for determining design conditions or conditions for connecting structures to the infrastructure network, for information.
If it finds that the requirements in paragraphs 1–3 of this Article are not met, the competent authority dismisses the application by decision within five working days of submission, stating all deficiencies.
The competent authority shall refuse the application by decision if a construction permit is required for the works specified in the application, within five working days of submission.
For works under Article 145 of the Law for which payment of a contribution for development of construction land is prescribed, the decision approving the works also determines the amount and method of payment of the contribution for development of construction land, the security instrument in the case of payment in instalments, and the investor's obligation to pay the contribution in full before works begin, or, in the case of payment in instalments, to provide the security instrument and pay the first instalment.
If the applicant submits a corrected application and remedies all deficiencies no later than 30 days after publication of the decision referred to in paragraph 6 of this Article, the applicant does not resubmit the documentation submitted with the dismissed application or pay again the administrative fees and the charge referred to in Article 26 paragraph 2 item 3) of this Rulebook.
The applicant may exercise the right to submit a corrected application without the obligation to submit the documentation submitted with the dismissed application and to pay again the administrative fee for submitting the application and the charge referred to in Article 26 paragraph 2 item 3) of this Rulebook only once.
If the competent authority does not approve the works in the application procedure, the applicant is entitled to a refund of the republican administrative fee for issuing the decision referred to in Article 26 paragraph 2 item 3) of this Rulebook, or to use that fee in a repeated procedure.
If the applicant submits with the corrected application referred to in paragraph 9 of this Article a document amended in relation to the document already submitted with the application referred to in paragraph 6 of this Article, the competent authority shall act on that amended document. If the amended document gives rise to an additional formal deficiency that is grounds for dismissal of the application, the applicant may not again exercise the right referred to in paragraph 9 of this Article.
…
If the applicant has not corrected the deficiencies in the corrected application, or if additional formal deficiencies have been identified in the case referred to in paragraph 12 of this Article, the competent authority shall issue a decision dismissing the application.
The right to appeal or bring an action before the administrative court against decisions referred to in paragraphs 4, 6–7 and 14 of this Article is governed, by corresponding application, by the provisions of this Rulebook governing the right to appeal or initiate an administrative dispute under Article 21 of this Rulebook.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Koje pogodnosti i pravni lijek prate zahtjev za član 145?Po formalnom odbacivanju, usaglašeni zahtjev u najkasnije 30 dana od objavljivanja uz otklanjanje svih nedostataka ima jednom…
- U kom roku i kako organ odlučuje o članu 145 zahtjevu?Kad su uslovi ispunjeni donosi rješenje u pet radnih dana i dostavlja ga bez odlaganja, najkasnije u tri dana, podnosiocu i…
- If technical documentation is submitted in DWF/DWFX/DWG, must a PDF also be provided?Yes. DWF/DWFX/DWG is permitted in prescribed cases, but a copy in PDF format, appropriately electronically signed, must also be…
- Is a CEOP application submitted and signed through CIS?Yes. The relevant application is completed through CIS and signed with the qualified electronic signature of the applicant or…
- In what format is a site plan submitted to CEOP?The site plan must also be submitted in DWG or DXF format, georeferenced in the national coordinate system, together with the…
- What must be attached when a CEOP application is submitted through an authorised representative?A power of attorney in electronic PDF form with a qualified electronic signature, or a properly digitised power of attorney…