Procedures and documentation
What does the main volume of the preliminary design contain?
Answer
Informational English translation. Machine translated; not independently reviewed.
The basic content from Annex 1, the investor’s decision appointing the lead designer (Annex 8), the lead designer’s statement on mutual consistency of the design sections (Annex 3), a concise technical description of the existing and proposed condition (Annex 1A), and conditions obtained outside the unified procedure. For the IDP for reconstruction of linear infrastructure, except electricity distribution and electronic communications networks, a statement by the technical review provider with a summary of the report from Annex 5, certified by the responsible person of the technical review provider, is also attached.
Original Serbian quotation
„Главна свеска идејног пројекта осим основног садржаја из члана 25. и Прилога 1. овог правилника, садржи и:
1) одлуку о именовању главног пројектанта потписану од стране инвеститора, из Прилога 8. овог правилника;
2) изјаву главног пројектанта којом се потврђује међусобна усаглашеност делова идејног пројекта, из Прилога 3. овог правилника;
3) сажети технички опис постојећег и предвиђеног стања, објекта, инсталација и опреме, потписан од стране главног пројектанта, из Прилога 1А. овог правилника.
4) услове прибављене ван обједињене процедуре
У случају идејног пројекта израђеног за потребе реконструкције линијских инфраструктурних објеката, осим у случају електродистрибутивне и електронске комуникационе мреже, главној свесци се прилаже изјава вршиоца техничке контроле са резимеом извештаја техничке контроле из Прилога 5. овог правилника оверена од стране одговорног лица вршиоца техничке контроле.
3.2. Садржина идејног пројекта”
Informational English translation of the quotation
In addition to the basic content referred to in Article 25 and Annex 1 of this Rulebook, the main volume of the preliminary design also contains:
1) the decision appointing the lead designer, signed by the investor, from Annex 8 of this Rulebook;
2) the lead designer’s statement confirming the mutual consistency of the sections of the preliminary design, from Annex 3 of this Rulebook;
3) a concise technical description of the existing and proposed condition of the structure, installations and equipment, signed by the lead designer, from Annex 1A of this Rulebook.
4) conditions obtained outside the unified procedure
In the case of a preliminary design prepared for the reconstruction of linear infrastructure structures, except in the case of electricity distribution and electronic communications networks, a statement by the technical review provider with a summary of the technical review report from Annex 5 of this Rulebook, certified by the responsible person of the technical review provider, shall be attached to the main volume.
3.2. Content of the preliminary designInformational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Koji obrasci i uslovni podaci čine glavnu svesku?Prilog 1 daje obrasce 0.1–0.12, uključujući odluku o imenovanju i izjavu glavnog projektanta i u IDR, te podatke o…
- Koliki je i šta sadrži sažeti tehnički opis?Glavni projektant potpisuje sažeti opis osnovnih podataka o lokaciji, objektu, oblikovanju, programu, funkciji, konstrukciji…
- Ko ovjerava rezime izvještaja TK i koje uslovne potvrde se navode?Rezime iz Priloga 5 ovjeravaju svi vršioci TK. Izjava potvrđuje propisane aspekte kontrole; usklađenost sa elaboratima navodi se…
- Šta IDR dodatno sadrži: Површинске и денивелисане раскрснице на државним путевима I и II реда?Širi ortofoto prikaz i situacioni plan rješenja sa državnim putevima, u odgovarajućoj razmjeri i uz izričiti izuzetak…
- Šta IDR dodatno sadrži: Постављање инсталација у земљишном и заштитном појасу државног пута I и II реда?Situacioni plan trase, geodetski snimljeni profili puta sa parcelama, položajem instalacija/zaštitnih cijevi i potrebnim…
- Šta IDR dodatno sadrži: Реконструкција и изградња државног пута I и II реда и припадајућих путних објеката?Ako su urađeni, prethodna studija/GNP sa ovjerom i izvještajem revizione komisije, te širi ortofoto i situacioni prikaz sa…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal