Procedures and documentation

In what order and with what numbers are parts of the technical documentation designated?

Answer

Informational English translation. Machine translated; not independently reviewed.

0 Main volume, 1 Architectural design, 2/1 Structural design, 2/2 Road design, 3 Hydrotechnical installations design, 4 Electrical power installations design, 5 Telecommunications and signalling installations design, 6 Mechanical installations design, 7 Technology design, 8 Traffic and traffic signalling design, 9 External works design, 10 Preparatory works/structure demolition design. If the documentation does not contain all designs, the sequence numbers are NOT changed.

Note: The source is Annex 1, section 0.5, not Article 90 on entry into force. The numbering and volume designations are retained in accordance with the annex.

Original Serbian quotation

„У случају да техничка документација не садржи све пројекте не мењати редни број пројеката према областима”
Informational English translation of the quotation
If the technical documentation does not contain all designs, do not change the sequence numbers of the designs by discipline.

Official source ↗

Regulation
Pravilnik o sadržini, načinu izrade i kontroli tehničke dokumentacije
Article
Art. Prilog 1
Official gazette
Sl. glasnik RS, br. 96/2023
Topic
Procedures and documentation

Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.

Explore related rules →

Related questions

Search building rules

The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal

SEARCH
Select Language