Procedures and documentation
When are conditions for connection to a district heating system obtained?
Answer
Informational English translation. Machine translated; not independently reviewed.
For district heating or gas distribution, conditions are obtained if the concept design provides for connection and they are not in the plan or separate conditions document. For gas/biogas production, transport and distribution structures and structures under the ministry or autonomous province, the authority obtains crossing and parallel routing conditions ex officio, while the investor obtains design and connection conditions under energy law outside the unified procedure.
Original Serbian quotation
„Услови за прикључење на систем даљинског грејања, односно на дистрибутивни систем природног гаса, прибављају се ако је прикључење на тај систем предвиђено идејним решењем приложеним уз захтев за издавање локацијских услова, а ти услови нису садржани у планском документу, односно сепарату.
За објекте који су у функцији транспорта, дистрибуције и производње природног гаса, односно биогаса, као и за објекте за које грађевинску дозволу издаје министарство надлежно за послове грађевинарства, односно надлежни орган аутономне покрајине, надлежни орган по службеној дужности прибавља услове за укрштање и паралелно вођење у погледу прикључења на дистрибутивни систем, односно на систем за транспорт природног гаса, а услове за пројектовање и прикључење не прибавља надлежни орган у оквиру обједињене процедуре, већ инвеститор у складу са законом којим се уређује енергетика.
6. Водни услови”
Informational English translation of the quotation
Conditions for connection to a district heating system or natural gas distribution system shall be obtained if connection to that system is provided for in the concept design attached to the application for location conditions and those conditions are not contained in the planning document or separate conditions document.
For structures serving the transport, distribution and production of natural gas or biogas, and for structures for which the construction permit is issued by the ministry responsible for construction or the competent authority of the autonomous province, the competent authority shall obtain ex officio conditions for crossing and parallel routing concerning connection to the distribution system or natural gas transport system; design and connection conditions shall not be obtained by the competent authority within the unified procedure, but by the investor in accordance with the law governing energy.
6. Water conditionsInformational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Da li solarna elektrana do 1 MW bez lokacijskih uslova ipak zahtijeva posebne uslove i saglasnosti?Da. Za solarnu elektranu do 1 MW iz člana 5 stav 1, za sopstvene potrebe u privredno-industrijskom kompleksu bez dalje isporuke…
- How are documents exchanged when obtaining location conditions?Acts and documentation exchanged between the authority and the holder when obtaining location conditions (LU) are exchanged…
- Na koga glase LU i koliko IDR obavezuje dalju razradu?LU glase na parcele, ne ime podnosioca. Sadrže spisak uslova sa izdavaocem/brojem/datumom i listu obaveznih ugovora sa fazom…
- Šta LU moraju navesti za nedostajuću infrastrukturu i priključenje proizvodnje na prenos?Kada imalac utvrdi da bez nove/dograđene infrastrukture ili opremanja nije moguća gradnja, LU navode da nema faktičkih uslova i…
- Who may use issued location conditions?Location conditions may be used by any person who meets the conditions for a construction permit or a decision under Article 145…
- Can different location conditions be issued for the same cadastral parcel?At the request of one or more applicants, several different location conditions may be issued for the same cadastral parcel, in…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal