Procedures and documentation
What are the grounds for rejecting an application?
Answer
Informational English translation. Machine translated; not independently reviewed.
Grounds for rejection are lack of competence, improper form, missing concept design or proof of payment of the fee/CEOP charge, a case in which location conditions are not required, missing concept design data, or inconsistency between planning parameters and the plan. All actual grounds and deficiencies are stated. The authority corrects an incorrectly entered class/use through CIS based on the concept design instead of rejecting the application solely for that reason.
Original Serbian quotation
„Поступак за издавање локацијских услова покреће се подношењем захтева надлежном органу.
По пријему захтева из става 1. овог члана, надлежни орган проверава испуњеност формалних услова за поступање по захтеву и да ли је надлежан за поступање по захтеву.
Надлежни орган ће закључком одбацити захтев за издавање локацијских услова ако није надлежан за поступање по захтеву.
Надлежни орган ће закључком одбацити захтев за издавање локацијских услова и у следећим случајевима:
1) ако захтев није поднет у прописаној форми;
2) ако уз захтев није приложено идејно решење;
3) ако уз захтев није приложен доказ о уплати административне таксе за подношење захтева и накнаде за централну евиденцију;
4) ако се за изградњу или извођење радова из захтева не прибављају локацијски услови;
5) ако идејно решење не садржи податке потребне за издавање локацијских услова;
6) ако постоји неслагање урбанистичких параметара у идејном решењу са урбанистичким параметрима дефинисаним планским документом.
У закључку из ст. 3. и 4. овог члана надлежни орган таксативно наводи све разлоге за одбацивање захтева, а нарочито наводи недостајуће податке у захтеву, недостајуће доказе и недостатке прилога који су поднети уз захтев ако их има, укључујући и недостатке идејног решења због којих се не могу израдити комплетни локацијски услови, односно услови за пројектовање и прикључење.
Изузетно од става 4. овог члана, надлежни орган неће одбацити захтев за издавање локацијских услова ако је подносилац у захтеву погрешно унео класу и намену објекта, већ ће те податке исправити кроз ЦИС, на основу идејног решења достављеног уз захтев.
На закључак из ст. 3. и 4. овог члана подносилац захтева може поднети приговор у року од три дана од дана достављања, преко првостепеног органа надлежном општинском, односно градском већу, а ако је закључак донело надлежно министарство или надлежни орган аутономне покрајине, приговор се изјављује Влади, односно извршном органу аутономне покрајине.
Ако подносилац захтева у року од 30 дана од дана објављивања закључка из ст. 3. и 4. овог члана, кроз ЦИС поднесе усаглашен захтев, не доставља документацију поднету уз захтев који је одбачен, нити поново плаћа административну таксу и накнаду за централну евиденцију.
Прибављање података од органа надлежног за послове државног премера и катастра”
Informational English translation of the quotation
The procedure for issuing location conditions is initiated by submitting an application to the competent authority.
Upon receiving the application referred to in paragraph 1 of this Article, the competent authority checks whether the formal conditions for processing it are met and whether it is competent to process it.
The competent authority shall reject the application for location conditions by procedural decision if it is not competent to process it.
The competent authority shall also reject the application for location conditions by procedural decision in the following cases:
1) if the application was not submitted in the prescribed form;
2) if the concept design was not attached to the application;
3) if proof of payment of the administrative application fee and Central Register charge was not attached to the application;
4) if location conditions are not required for the construction or works in the application;
5) if the concept design does not contain data needed to issue location conditions;
6) if planning parameters in the concept design differ from those defined in the planning document.
In the procedural decision referred to in paragraphs 3 and 4 of this Article, the competent authority shall exhaustively state all grounds for rejection, in particular missing application data, missing evidence and any deficiencies in attachments submitted with the application, including concept design deficiencies preventing complete location conditions or design and connection conditions from being prepared.
By way of exception to paragraph 4 of this Article, the competent authority shall not reject an application for location conditions if the applicant incorrectly entered the class and use of the structure in the application, but shall correct those data through CIS based on the concept design submitted with the application.
The applicant may lodge an objection against the procedural decision referred to in paragraphs 3 and 4 of this Article within three days of service, through the first-instance authority to the competent municipal or city council; if the decision was made by the competent ministry or competent authority of the autonomous province, the objection is made to the Government or executive authority of the autonomous province, respectively.
If within 30 days of publication of the procedural decision referred to in paragraphs 3 and 4 of this Article the applicant submits a corrected application through CIS, the applicant does not submit documentation submitted with the rejected application again and does not pay the administrative fee and Central Register charge again.
Obtaining data from the authority responsible for state surveying and cadastreInformational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- When does an authority reject an application for lack of competence?The authority rejects the application by conclusion if it is not competent to process it.
- Kako se osporava zaključak o odbacivanju LU po Uredbi?Zaključak navodi sve razloge i nedostatke, uključujući IDR. Podnosilac može prigovoriti u 3 dana od dostavljanja preko…
- How is the procedure for issuing location conditions initiated?The procedure is initiated by submitting an application to the competent authority.
- What does the authority check after receiving an application?The authority checks whether the formal requirements are met and whether it has jurisdiction to process the application.
- Da li solarna elektrana do 1 MW bez lokacijskih uslova ipak zahtijeva posebne uslove i saglasnosti?Da. Za solarnu elektranu do 1 MW iz člana 5 stav 1, za sopstvene potrebe u privredno-industrijskom kompleksu bez dalje isporuke…
- How are documents exchanged when obtaining location conditions?Acts and documentation exchanged between the authority and the holder when obtaining location conditions (LU) are exchanged…