What must be submitted with an application for a construction permit?

Answer

Informational English translation. Machine translated; not independently reviewed.

The application through CIS includes an extract from the PGD with a specification of separate parts, if any; the PGD; the lead designer's statement if not in the extract; the technical review report; evidence of fees; the appropriate right, subject to statutory exceptions; the agreement with the financier if concluded and named; an agreement or other evidence of missing infrastructure if required, or confirmation from the operator for infrastructure already built but not registered; the design review commission report for Article 133, subject to the exceptions in Articles 52/53; an energy permit where prescribed; energy conditions not in the location conditions; the land-use conversion fee where payable before the permit; EIA documentation and a statement by the investor and responsible designer; and the decision approving the construction waste plan. Also check special attachments for phases of a residential complex, changes to plots and public areas, and the declaration on the contribution and conditional security for instalments. Not every conditional attachment is required in every case.

Note: The scope of the impact assessment and waste management plan is determined under the relevant special regulations; not every attachment is unconditionally prescribed for every structure.

Original Serbian quotation

„Поступак за издавање грађевинске дозволе покреће се подношењем захтева надлежном органу кроз ЦИС. Уз захтев из става 1. овог члана прилаже се: 1) извод из пројекта за грађевинску дозволу, израђен у складу са правилником којим се уређује садржина техничке документације, као и спецификација посебних делова објекта, ако постоје посебни делови објекта (њихово означење – назив и ознака, спрат, структура, и нето површина); 2) пројекат за грађевинску дозволу, израђен у складу са правилником којим се уређује садржина техничке документације; 3) изјава главног пројектанта који је оверио извод из пројекта за грађевинску дозволу да су сви подаци из тог извода одговарајући пројекту за грађевинску дозволу и да су усклађени са локацијским условима на основу којих је поднет захтев за издавање грађевинске дозволе, ако та изјава није садржана у изводу из пројекта за грађевинску дозволу; 4) извештај о техничкој контроли пројекта; 5) доказ о уплати административне таксе за подношење захтева и доношење решења о грађевинској дозволи и накнадe за Централну евиденцију; 6) доказ о одговарајућем праву на земљишту или објекту у смислу Закона, осим ако је то право уписано у јавној књизи или је успостављено законом, односно ако је Законом прописано да се тај доказ не доставља; 7) уговор између инвеститора и финансијера, ако је закључен и ако је у захтеву за издавање грађевинске дозволе наведен финансијер; 8) уговор између инвеститора и имаоца јавних овлашћења, односно други доказ о обезбеђивању недостајуће инфраструктуре, ако је то услов за издавање грађевинске дозволе предвиђен локацијским условима, односно у случају да су радови на изградњи недостајуће инфраструктуре завршени, али нису уписани у регистар о евиденцији непокретности и/или инфраструктуре потврда или уверење управљача да је недостајућа инфраструктура изграђена, односно да нема услова за закључење уговора о изградњи недостајуће инфраструктуре; 9) извештај ревизионе комисије, за објекте из члана 133. Закона. Изузетно, ако је реч о подношењу захтева за издавање грађевинске дозволе из члана 52. став 2. овог правилника, а локацијски услови су исходовани пред надлежним органом јединице локалне самоуправе, као и у случају из члана 53. овог правилника не доставља се извештај ревизионе комисије; 10) енергетску дозволу, издату у складу са посебним законом, за изградњу енергетских објеката за које постоји обавеза прибављања енергетске дозволе; 11) услове за пројектовање и прикључење објеката на дистрибутивни, односно преносни систем електричне енергије, као и на дистрибутивни, односно систем за транспорт природног гаса, који су прибављени у складу са законом којим се уређује енергетика, а нису садржани у локацијским условима; 12) доказ да је плаћена накнада за промену намене земљишта из пољопривредног, односно шумског земљишта, у грађевинско земљиште, ако се ради о земљишту за које је прописано плаћање ове накнаде пре издавања грађевинске дозволе; 13) студију о процени утицаја на животну средину, сагласност на студију о процени утицаја на животну средину, односно одлука да није потребно покретање поступка процене утицаја пројекта на животну средину, издата у складу са законом о процени утицаја на животну средину, уз изјаву инвеститора и одговорног пројектанта, којом потврђују да је приложена документација усаглашена са мерама и условима заштите животне средине; 14) решење о сагласности на план управљања отпадом од грађења и рушења. За објекте у стамбеном комплексу, који се граде у фазама одређеним локацијским условима на једној грађевинској парцели, ако се део објекта из следеће фазе гради на подземном делу објекта из претходне фазе, уз захтев из става 1. овог члана доставља се и обавештење грађевинске инспекције о завршетку изградње прве фазе објекта у конструктивном смислу. Ако је до подношења захтева у катастру спроведена парцелација, односно препарцелација у складу са издатим локацијским условима или је промењен број парцеле, односно парцела за које су издати локацијски услови, уз захтев се прилаже и доказ о тој промени (решење, односно уверење органа надлежног за послове државног премера и катастра о извршеној парцелацији, односно препарцелацији, односно промени броја парцеле, односно парцела). Уз захтев за издавање грађевинске дозволе за реконструкцију и санацију јавних саобраћајних и других јавних површина, путних објеката и функционалних садржаја пута у регулацији постојеће саобраћајнице, а који није уписан у катастар непокретности, у складу са законом којим се уређује упис непокретности, не доставља се доказ о одговарајућем праву на земљишту, односно објекту, већ се као доказ подноси елаборат геодетских радова постојећег стања на катастарској подлози који је израђен од овлашћеног лица уписаног у одговарајући регистар у складу са Законом и одговарајућа изјава инвеститора о изграђеним објектима. За објекте за које је прописано плаћање доприноса за уређивање грађевинског земљишта, саставни део захтева из става 1. овог члана је и изјашњење подносиоца о начину плаћања доприноса за уређивање грађевинског земљишта, као и средствима обезбеђења у случају плаћања на рате, за објекте чија укупна бруто развијена грађевинска површина прелази 200 m² и који садржи више од две стамбене јединице.”
Informational English translation of the quotation
The procedure for issuing a construction permit is initiated by submitting an application to the competent authority through CIS. The following must be attached to the application referred to in paragraph 1 of this Article: 1) an extract from the design for a construction permit, prepared in accordance with the Rulebook governing the content of technical documentation, and a specification of separate parts of the structure, if there are separate parts (their identification - name and designation, floor, layout and net area); 2) the design for a construction permit, prepared in accordance with the Rulebook governing the content of technical documentation; 3) a statement by the lead designer who certified the extract from the design for a construction permit that all data in the extract correspond to the design for a construction permit and are consistent with the location conditions on the basis of which the application for a construction permit was submitted, if that statement is not contained in the extract; 4) the technical review report on the design; 5) proof of payment of the administrative fee for submitting the application and issuing the construction permit decision and the Central Register fee; 6) proof of the appropriate right to the land or structure within the meaning of the Law, unless that right is registered in a public register or established by law, or the Law provides that such proof is not submitted; 7) the agreement between the investor and the financier, if concluded and if the financier is named in the construction permit application; 8) the agreement between the investor and the holder of public authority, or other proof that the missing infrastructure has been provided for, if this is a condition for issuing the construction permit provided for in the location conditions, or, where construction of the missing infrastructure has been completed but it has not been registered in the register of real property and/or infrastructure, confirmation or a certificate from the operator that the missing infrastructure has been built, or that the conditions for concluding an agreement on its construction are not met; 9) the design review commission report for structures referred to in Article 133 of the Law. Exceptionally, where an application for a construction permit under Article 52 paragraph 2 of this Rulebook is submitted and the location conditions were obtained from the competent local self-government authority, and in the case under Article 53 of this Rulebook, the design review commission report is not submitted; 10) an energy permit issued under a special law for construction of energy structures for which an energy permit must be obtained; 11) conditions for design and connection of structures to the electricity distribution or transmission system and to the natural gas distribution or transport system, obtained in accordance with the law governing energy and not contained in the location conditions; 12) proof that the fee for conversion of agricultural or forest land into construction land has been paid, if the land is subject to payment of this fee before the construction permit is issued; 13) the environmental impact assessment study, approval of the environmental impact assessment study, or a decision that initiation of the environmental impact assessment procedure for the project is not required, issued in accordance with the law on environmental impact assessment, together with a statement by the investor and responsible designer confirming that the submitted documentation complies with environmental protection measures and conditions; 14) the decision approving the construction and demolition waste management plan. For structures in a residential complex built in phases specified by the location conditions on one construction plot, if part of the structure from the next phase is built on the underground part of the structure from the preceding phase, the application referred to in paragraph 1 of this Article must also be accompanied by a notice from the construction inspectorate that the first phase of the structure has been completed structurally. If, by the time the application is submitted, subdivision or re-parcelling has been carried out in the cadastre in accordance with the issued location conditions, or the number of the plot or plots for which the location conditions were issued has changed, proof of that change must also be attached to the application (a decision or certificate of the authority responsible for state survey and cadastre confirming the subdivision, re-parcelling or change of the number of the plot or plots). For an application for a construction permit for reconstruction and rehabilitation of public traffic and other public areas, road structures and functional road facilities within the regulation line of an existing road which is not registered in the real estate cadastre in accordance with the law governing registration of real property, proof of the appropriate right to the land or structure is not submitted; instead, a geodetic works technical report on the existing state on a cadastral base, prepared by an authorised person registered in the appropriate register in accordance with the Law, and an appropriate statement by the investor on the built structures are submitted as proof. For structures subject to the contribution for development of construction land, the application referred to in paragraph 1 of this Article must also include the applicant's declaration on the method of payment of the contribution for development of construction land, as well as the security in the event of payment in instalments, for structures whose total gross developed floor area exceeds 200 m² and which contain more than two residential units.

Official source ↗

Regulation
Pravilnik o sprovođenju objedinjene procedure (CEOP)
Article
Art. 16
Official gazette
Sl. glasnik RS, br. 96/2023 i 33/2026
Topic
Procedures and documentation

Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.