What waste management measures are implemented on the construction site?

Answer

Informational English translation. Machine translated; not independently reviewed.

Separating useful components before work begins; preventing the mixing of hazardous and non-hazardous waste; preventing hazardous waste from spilling into soil, water and air; designating a place for temporary storage on the construction site; testing and classification of waste; carrying out work so as to prevent waste generation; encouraging reuse; and keeping records and reporting.

Original Serbian quotation

„Мере за управљање отпадом од грађења и рушења су: 1) издвајање корисних компоненти из и са објекта пре започињања грађевинских и других радова, које се не сматрају отпадом у складу са законом којим се прописује управљање отпадом и које могу поново да се употребе у исту сврху за коју су произведени (опека, цреп и сл.); 2) спречавање мешања опасног и неопасног отпада од грађења и рушења и мешања различитих врста отпада; 3) спречавање разношења, разливања, истицања опасног отпада у земљиште, површинске и подземне воде и ваздух; 4) одређивање места за привремено складиштење отпада од грађења и рушења на месту настанка, односно на градилишту; 5) испитивање и класификацију отпада од грађења и рушења; 6) извођење радова на начин да се спречава настајање отпада; 7) подстицање поновне употребе и поновног искоришћења отпада од грађења и рушења; 8) вођење евиденције и извештавање о количини и врсти генерисаног отпада од грађења и рушења, као и о третману ком је подвргнут.”
Informational English translation of the quotation
Construction and demolition waste management measures are: 1) separation of useful components from within and on the structure before the start of construction and other works, which are not considered waste under the law governing waste management and which can be reused for the same purpose for which they were produced (bricks, roof tiles, etc.); 2) prevention of mixing hazardous and non-hazardous construction and demolition waste and mixing different types of waste; 3) prevention of the dispersal, spilling and leakage of hazardous waste into soil, surface water, groundwater and air; 4) designation of a place for temporary storage of construction and demolition waste at the place of generation, namely on the construction site; 5) testing and classification of construction and demolition waste; 6) carrying out works in a way that prevents waste generation; 7) encouragement of reuse and recovery of construction and demolition waste; 8) keeping records and reporting on the quantity and type of construction and demolition waste generated, as well as the treatment to which it has been subjected.

Official source ↗

Regulation
Uredba o načinu i postupku upravljanja otpadom od građenja i rušenja
Article
Art. 5
Official gazette
Sl. glasnik RS, br. 93/2023 i 94/2023 — ispravka
Topic
Procedures and documentation

Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.