Procedures and documentation
When can temporary structures become permanent?
Answer
Informational English translation. Machine translated; not independently reviewed.
Only structures listed in Article 29a: asphalt plants/concrete batching plants for municipal street maintenance, temporary toll stations with ancillary structures, temporary roads/connections and utility network connections for construction or operation. An occupancy permit must be obtained before the temporary construction permit expires; location conditions for a permanent structure must first be obtained and an application made to amend the temporary permit into a construction permit for a permanent structure. Further procedures follow the Rulebook.
Note: There is no general right for every concrete batching plant or every temporary structure to become permanent merely by obtaining an occupancy permit.
Original Serbian quotation
„Објекти асфалтне базе и фабрике бетона за обављање комуналне делатности одржавања улица у градовима и другим насељеним местима, привремене наплатне станице са пратећим објектима, привремене саобраћајнице и прикључци и прикључци на комуналну мрежу за потребе грађења или експлоатације објеката, могу постати трајни објекти, уколико инвеститор пре истека рока важења привремене грађевинске дозволе, прибави употребну дозволу за ове објекте.
У случају из става 1. овог члана инвеститор је дужан да пре подношења захтева за издавање употребне дозволе, прибави локацијске услове за трајни објекат, као и да по издавању локацијских услова поднесе захтев за измену привремене грађевинске дозволе у грађевинску дозволу за трајни објекат.
По доношењу решења о измени грађевинске дозволе, сви даљи поступци, укључујући издавање употребне дозволе и упис права својине на изграђеном објекту, односно посебним деловима објекта и издавањем решења о кућном броју, спроводе се и окончавају по одредбама овог правилника.”
Informational English translation of the quotation
Asphalt plant structures and concrete factories for the municipal activity of maintaining streets in cities and other settlements, temporary toll stations with ancillary structures, temporary roads and connections and connections to the utility network for the purposes of construction or operation of structures may become permanent structures if the investor obtains an occupancy permit for these structures before the temporary construction permit expires.
In the case referred to in paragraph 1 of this Article, the investor must obtain location conditions for the permanent structure before applying for an occupancy permit, and, once the location conditions have been issued, apply to amend the temporary construction permit into a construction permit for a permanent structure.
After the decision amending the construction permit is issued, all further procedures, including issuance of the occupancy permit and registration of ownership of the constructed structure or its separate parts and issuance of a house number decision, shall be conducted and completed under this Rulebook.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- If technical documentation is submitted in DWF/DWFX/DWG, must a PDF also be provided?Yes. DWF/DWFX/DWG is permitted in prescribed cases, but a copy in PDF format, appropriately electronically signed, must also be…
- Is a CEOP application submitted and signed through CIS?Yes. The relevant application is completed through CIS and signed with the qualified electronic signature of the applicant or…
- In what format is a site plan submitted to CEOP?The site plan must also be submitted in DWG or DXF format, georeferenced in the national coordinate system, together with the…
- What must be attached when a CEOP application is submitted through an authorised representative?A power of attorney in electronic PDF form with a qualified electronic signature, or a properly digitised power of attorney…
- How many times can I exercise the right to submit a compliant application without paying the administrative fee again and without resubmitting documentation already submitted?The benefit of a compliant application without resubmitting documentation and fees and charges already paid may be used only…
- Kako se izdaje klauzula pravnosnažnosti i ispravlja greška akta?Donosilac po službenoj dužnosti ili zahtjevu stranke izdaje klauzulu pravnosnažnosti kao propisno elektronski sastavljenu…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal