What must a construction permit decision contain?
Answer
Informational English translation. Machine translated; not independently reviewed.
The decision contains the identity of the investor/financier, details of the structure (overall dimensions, height, gross developed floor area, estimated cost), parcels, the structure being removed/existing structure, validity period, documentation, contribution and conditional security for instalments, rights/obligations under the agreement on missing infrastructure and other statutory information. The location conditions, conditions obtained outside the procedure, extract, design for a construction permit and conditional specification of separate parts form integral parts.
Original Serbian quotation
„Решење о грађевинској дозволи садржи податке о:
1) инвеститору, односно инвеститору и финансијеру са навођењем матичног броја за правна лица, односно јединственог матичног броја грађана за физичка лица;
2) објекту чије се грађење дозвољава, са подацима о габариту, висини, бруто развијеној грађевинској површини и предрачунској вредности објекта;
3) катастарској парцели, односно катастарским парцелама на којима се гради објекат (број парцеле и назив катастарске општине и јединице локалне самоуправе на којој се објекат налази);
4) постојећем објекту који се уклања или на коме се изводе радови;
5) року важења грађевинске дозволе;
6) документацији на основу које се грађевинска дозвола издаје;
7) износу и начину плаћања доприноса за уређивање грађевинског земљишта, укључујући и право на умањење, на основу уговора са имаоцима јавних овлашћења, као и средству обезбеђења у случају плаћања на рате (неопозива банкарска гаранција, односно хипотека на објекту);
8) правима и обавезама инвеститора и имаоца јавних овлашћења, ако је уз захтев за издавање грађевинске дозволе приложен и уговор између инвеститора и имаоца јавних овлашћења, односно други доказ о обезбеђивању недостајуће инфраструктуре, ако је то услов за издавање грађевинске дозволе предвиђен локацијским условима;
9) друге податке прописане Законом.
Саставни део решења из става 1. овог члана су локацијски услови, као и услови ималаца јавних овлашћења који су прибављени ван обједињене процедуре, извод из пројекта за грађевинску дозволу и пројекат за грађевинску дозволу, као и спецификација посебних делова објекта, ако објекат има посебне делове (која садржи означење посебних делова објекта – назив и ознаку, спрат, структуру, и нето површину).
Ако је грађевинска дозвола издата за објекат из члана 133. став 2. тачка 9) Закона, за који су предвиђене мере заштите културних добара, у складу са законом којим се уређује заштита непокретног културног добра, грађевинска дозвола обавезно садржи упутство инвеститору да је дужан да најкасније пре отпочињања извођења радова достави надлежном органу кроз ЦИС пројекат за извођење, у складу са чланом 3. овог правилника.
Ако је уз захтев достављен доказ о парцелацији, односно препарцелацији спроведеној у складу са издатим локацијским условима, односно доказ о промени броја парцеле, односно парцела за које су издати локацијски услови, грађевинска дозвола ће се издати у складу са том променом, без обавезе измене локацијских услова.”
Informational English translation of the quotation
The construction permit decision contains information on:
1) the investor, or the investor and financier, stating the registration number for legal entities or the unique personal identification number for natural persons;
2) the structure whose construction is authorised, including its overall dimensions, height, gross developed floor area and estimated cost;
3) the cadastral parcel or cadastral parcels on which the structure is built (parcel number and name of the cadastral municipality and local self-government unit in which the structure is located);
4) the existing structure being removed or on which works are performed;
5) the validity period of the construction permit;
6) the documentation on the basis of which the construction permit is issued;
7) the amount and method of payment of the contribution for development of construction land, including the right to a reduction based on a contract with holders of public authority, and the security instrument in the case of payment in instalments (an irrevocable bank guarantee or a mortgage on the structure);
8) the rights and obligations of the investor and holder of public authority, if the construction permit application was accompanied by a contract between the investor and holder of public authority or other evidence that the missing infrastructure has been secured, if this is a condition for issuing the construction permit provided for in the location conditions;
9) other information prescribed by the Act.
The location conditions, conditions of holders of public authority obtained outside the unified procedure, extract from the design for a construction permit and design for a construction permit, and the specification of separate parts of the structure if it has separate parts (containing the designation of the separate parts of the structure - name and identifier, storey, layout and net area), form an integral part of the decision referred to in paragraph 1 of this Article.
If the construction permit is issued for a structure referred to in Article 133 paragraph 2 item 9) of the Act, for which cultural property protection measures are envisaged in accordance with the law governing the protection of immovable cultural property, the construction permit must contain instructions informing the investor that it must submit the design for execution (PZI) to the competent authority through CIS no later than before the start of works, in accordance with Article 3 of this Rulebook.
If the application was accompanied by evidence of subdivision or re-subdivision carried out in accordance with the issued location conditions, or evidence of a change in the number of the parcel or parcels for which location conditions were issued, the construction permit shall be issued in accordance with that change, without an obligation to amend the location conditions.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- Kada GD sadrži uputstvo o PZI i prati promjenu parcela bez novih LU ?Za objekat iz člana 133 stav 2 tačka 9 sa mjerama zaštite kulturnog dobra GD nalaže dostavu PZI kroz CIS najkasnije prije…
- If technical documentation is submitted in DWF/DWFX/DWG, must a PDF also be provided?Yes. DWF/DWFX/DWG is permitted in prescribed cases, but a copy in PDF format, appropriately electronically signed, must also be…
- Is a CEOP application submitted and signed through CIS?Yes. The relevant application is completed through CIS and signed with the qualified electronic signature of the applicant or…
- In what format is a site plan submitted to CEOP?The site plan must also be submitted in DWG or DXF format, georeferenced in the national coordinate system, together with the…
- What must be attached when a CEOP application is submitted through an authorised representative?A power of attorney in electronic PDF form with a qualified electronic signature, or a properly digitised power of attorney…
- How many times can I exercise the right to submit a compliant application without paying the administrative fee again and without resubmitting documentation already submitted?The benefit of a compliant application without resubmitting documentation and fees and charges already paid may be used only…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal