What must be submitted with an application for approval to carry out works?
Answer
Informational English translation. Machine translated; not independently reviewed.
An application for works under Article 145 paragraph 1 of the Planning and Construction Law is submitted through CIS. Article 26 lists: 1) the preliminary design or technical description and list of works, according to the documentation regulation; 2) the lead designer's statement of compliance with location conditions, if previously obtained; 3) proof of fees and the Central Register fee; 4) proof of the appropriate right, unless registered in a public register, established by law or not submitted under the Law; 5) an agreement with the financier only if concluded and the financier is named in the application; 6) an agreement or other proof that missing infrastructure has been provided for, if required by the location conditions, or the operator's confirmation or certificate for infrastructure built but not registered as prescribed; 7) energy conditions obtained under the energy law, if not included in the location conditions; 8) crossing and parallel routing conditions obtained outside the unified procedure in the cases in item 8; 9) conditions of the operators of lines on the route, if covered by the design, and proof of route compliance with the other competent holders of public authority in the cases of secondary or distribution networks and infrastructure or connections under item 9; 10) fire protection conditions obtained outside the unified procedure for reconstruction of the specified network carrying flammable or combustible liquids or flammable gases or construction of a connection; 11) the environmental impact assessment study and approval, or the decision that the procedure is not required, with the investor's and responsible designer's statement that the documentation complies with environmental protection measures and conditions; 12) the decision approving the construction and demolition waste management plan. For reconstruction of linear infrastructure structures, the technical review report on the IDP is also submitted, except for electricity distribution and electronic communications networks. If the contribution is payable, a declaration on the method of payment is attached; this Article links security for instalments to BRGP exceeding 200 m² and more than two residential units. When conditions of holders of public authority are required, location conditions are requested beforehand, except where location conditions already issued for the structure contain conditions for designing its connection.
Note: The list in Article 26 must be read with each condition and statutory exception; it is not a list of attachments unconditionally required for every structure. The waste plan and impact assessment apply within the scope of their respective special regulations. This rule does not replace checking the individual application. The official PIS has the typo ивођење in item 2; the quotation and index preserve it, while the explanation uses the usual term for carrying out works.
Original Serbian quotation
„Поступак за издавање решења о одобрењу за извођење радова из члана 145. став 1. Закона покреће се подношењем захтева надлежном органу кроз ЦИС. Уз захтев из става 1. овог члана прилаже се: 1) идејни пројекат, односно технички опис и попис радова израђен у складу са прописом којим се уређује садржина техничке документације; 2) изјава главног пројектанта да је идејни пројекат усклађен са локацијским условима, ако су за ивођење радова из члана 145. став 1. Закона претходно прибављени локацијски услови; 3) доказ о уплати административне таксе за подношење захтева и доношење решења и накнадe за централну евиденцију; 4) доказ о одговарајућем праву на земљишту или објекту у смислу Закона, осим ако је то право уписано у јавној књизи или је успостављено законом, односно ако је Законом прописано да се тај доказ не доставља; 5) уговор између инвеститора и финансијера, ако је закључен и ако је у захтеву за издавање решења наведен финансијер; 6) уговор између инвеститора и имаоца јавних овлашћења, односно други доказ о обезбеђивању недостајуће инфраструктуре, ако је то услов предвиђен локацијским условима, односно у случају да су радови на изградњи недостајуће инфраструктуре завршени, али нису уписани у регистар о евиденцији непокретности и/или инфраструктуре потврда или уверење управљача да је недостајућа инфраструктура изграђена, односно да нема услова за закључење уговора о изградњи недостајуће инфраструктуре; 7) услови за пројектовање и прикључење објеката на дистрибутивни, односно преносни систем електричне енергије, као и на дистрибутивни, односно систем за транспорт природног гаса, који су прибављени у складу са законом којим се уређује енергетика, а нису садржани у локацијским условима; 8) услови за укрштање и паралелно вођење, ако су у складу са уредбом којом се уређује издавање локацијских услова, прибављени ван обједињене процедуре, непосредно од управљача инсталација водова на траси предметног објекта (радови на реконструкцији, санацији и адаптацији постојеће инфраструктуре, изградњи прикључака на постојећу водоводну, канализациону, гасну и сл. мрежу, типских топловодних прикључака, привода за електронске комуникације и дела електродистрибутивне мреже од трансформаторске станице, односно дела мреже, до места прикључка на објекту купца, за које се издаје решење из члана 145. Закона); 9) услови за укрштање и паралелно вођење прибављени од управљача инсталација водова који су на траси предметног новог објекта, ако су предмет пројекта, као и доказ о усаглашености трасе са осталим имаоцима јавног овлашћења који би били надлежни за издавање услова за пројектовање и прикључење, у случају изградње или доградње секундарне, односно дистрибутивне мреже и комуналне и друге инфраструктуре у регулацији постојеће саобраћајнице, као и у случају изградње прикључака на ту инфраструктуру; 10) услови у погледу мера заштите од пожара и експлозија, ако су у складу са уредбом којом се уређује издавање локацијских услова, прибављени ван обједињене процедуре, непосредно од органа надлежног за послове заштите од пожара, (реконструкција постојеће инфраструктурне мреже са запаљивим и горивим течностима, као и са запаљивим гасовима, односно изградња прикључка на ове мреже за које се издаје решење из члана 145. Закона); 11) студија о процени утицаја на животну средину, сагласност на студију о процени утицаја на животну средину, односно одлука да није потребно покретање поступка процене утицаја пројекта на животну средину, издата у складу са законом о процени утицаја на животну средину, уз изјаву инвеститора и одговорног пројектанта, којом потврђују да је приложена документација усаглашена са мерама и условима заштите животне средине, 12) решење о сагласности на план управљања отпадом од грађења и рушења. У случају реконструкције линијских инфраструктурних објеката, изузев електродистрибутивне и електронске комуникационе мреже, доставља се и извештај о техничкој контроли идејног пројекта. За извођење радова за које је прописано плаћање доприноса за уређивање грађевинског земљишта, саставни део захтева из става 1. овог члана је и изјашњење подносиоца о начину плаћања доприноса за уређивање грађевинског земљишта, као и средствима обезбеђења у случају плаћања на рате, за објекте чија укупна бруто развијена грађевинска површина прелази 200 m² и који садржи више од две стамбене јединице. У случају извођења радова по захтеву из става 1. овог члана за које је потребно прибавити услове за пројектовање и прикључење од имаоца јавних овлашћења, пре подношења захтева из става 1. овог члана, инвеститор подноси захтев за издавање локацијских услова надлежном органу. Изузетно од става 5. овог члана, ако локацијски услови издати за објекат који се прикључује на инфраструктуру, садрже услове за пројектовање тог прикључка, решење о одобрењу за изградњу тог прикључка може се издати инвеститору без прибављања нових локацијских услова.”
Informational English translation of the quotation
The procedure for issuing a decision approving the carrying out of works under Article 145 paragraph 1 of the Law is initiated by submitting an application to the competent authority through CIS. The following must be attached to the application referred to in paragraph 1 of this Article: 1) the preliminary design or technical description and list of works prepared in accordance with the regulation governing the content of technical documentation; 2) a statement by the lead designer that the preliminary design complies with the location conditions, if location conditions were previously obtained for carrying out the works under Article 145 paragraph 1 of the Law; 3) proof of payment of the administrative fee for submitting the application and issuing the decision and the Central Register fee; 4) proof of the appropriate right to the land or structure within the meaning of the Law, unless that right is registered in a public register or established by law, or the Law provides that such proof is not submitted; 5) the agreement between the investor and the financier, if concluded and if the financier is named in the application for the decision; 6) the agreement between the investor and the holder of public authority, or other proof that missing infrastructure has been provided for, if this is a condition in the location conditions, or, where construction of the missing infrastructure has been completed but it has not been registered in the register of real property and/or infrastructure, confirmation or a certificate from the operator that the missing infrastructure has been built, or that the conditions for concluding an agreement on its construction are not met; 7) conditions for design and connection of structures to the electricity distribution or transmission system and to the natural gas distribution or transport system, obtained in accordance with the law governing energy and not included in the location conditions; 8) crossing and parallel routing conditions, if obtained outside the unified procedure, directly from the operators of utility lines on the route of the structure concerned, in accordance with the Regulation governing the issuance of location conditions (works on reconstruction, rehabilitation and adaptation of existing infrastructure, construction of connections to existing water supply, sewerage, gas and similar networks, standard district heating connections, electronic communications service lines and the part of the electricity distribution network from the transformer station or part of the network to the connection point at the customer's structure, for which a decision under Article 145 of the Law is issued); 9) crossing and parallel routing conditions obtained from the operators of utility lines on the route of the new structure concerned, if covered by the design, and proof of alignment of the route with the other holders of public authority that would be competent to issue design and connection conditions, in the case of construction or extension of secondary or distribution networks and utility and other infrastructure within the regulation line of an existing road, and in the case of construction of connections to that infrastructure; 10) conditions concerning fire and explosion protection measures, if obtained outside the unified procedure, directly from the authority responsible for fire protection, in accordance with the Regulation governing the issuance of location conditions (reconstruction of an existing infrastructure network carrying flammable and combustible liquids and flammable gases, or construction of a connection to these networks for which a decision under Article 145 of the Law is issued); 11) the environmental impact assessment study, approval of the environmental impact assessment study, or a decision that initiation of the environmental impact assessment procedure for the project is not required, issued in accordance with the law on environmental impact assessment, together with a statement by the investor and responsible designer confirming that the submitted documentation complies with environmental protection measures and conditions; 12) the decision approving the construction and demolition waste management plan. In the case of reconstruction of linear infrastructure structures, except for electricity distribution and electronic communications networks, the technical review report on the preliminary design must also be submitted. For works subject to the contribution for development of construction land, the application referred to in paragraph 1 of this Article must also include the applicant's declaration on the method of payment of the contribution for development of construction land, as well as the security in the event of payment in instalments, for structures whose total gross developed floor area exceeds 200 m² and which contain more than two residential units. Where works under the application referred to in paragraph 1 of this Article require design and connection conditions to be obtained from holders of public authority, the investor must submit an application for location conditions to the competent authority before submitting the application referred to in paragraph 1 of this Article. As an exception to paragraph 5 of this Article, if the location conditions issued for the structure being connected to infrastructure contain conditions for designing that connection, a decision approving construction of that connection may be issued to the investor without obtaining new location conditions.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- If technical documentation is submitted in DWF/DWFX/DWG, must a PDF also be provided?Yes. DWF/DWFX/DWG is permitted in prescribed cases, but a copy in PDF format, appropriately electronically signed, must also be…
- Is a CEOP application submitted and signed through CIS?Yes. The relevant application is completed through CIS and signed with the qualified electronic signature of the applicant or…
- In what format is a site plan submitted to CEOP?The site plan must also be submitted in DWG or DXF format, georeferenced in the national coordinate system, together with the…
- What must be attached when a CEOP application is submitted through an authorised representative?A power of attorney in electronic PDF form with a qualified electronic signature, or a properly digitised power of attorney…
- How many times can I exercise the right to submit a compliant application without paying the administrative fee again and without resubmitting documentation already submitted?The benefit of a compliant application without resubmitting documentation and fees and charges already paid may be used only…
- Kako se izdaje klauzula pravnosnažnosti i ispravlja greška akta?Donosilac po službenoj dužnosti ili zahtjevu stranke izdaje klauzulu pravnosnažnosti kao propisno elektronski sastavljenu…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal