Procedures and documentation
When is a preliminary design subject to expert review by the design review commission?
Answer
Informational English translation. Machine translated; not independently reviewed.
The preliminary design (IDP) for structures under Article 133 is subject to expert review by the design review commission. Separately, the IDP for reconstruction works on a linear infrastructure structure under Article 2, item 62 is subject to technical review, except for reconstruction of electricity distribution and electronic communications networks. Article 129 applies the same technical review conditions to that linear infrastructure IDP as to the design for a construction permit (PGD). This is not a general assertion that every IDP for any reconstruction is subject to technical review.
Original Serbian quotation
„Идејни пројекат се израђује за потребе изградње објеката и извођења радова из члана 145. овог закона.
Идејни пројекат се израђује и за потребе изградње објеката и извођења радова за објекте из члана 133. овог закона, у ком случају подлеже стручној контроли од стране ревизионе комисије.
Идејни пројекат из става 1. овог члана, који се израђује за потребе извођења радова из члана 2. тачка 62) овог закона подлеже техничкој контроли, у складу са одредбама овог закона, осим у случају реконструкције електродистрибутивне и електронске комуникационе мреже.
Идејни пројекат се израђује у складу са прописом којим се ближе уређује садржина техничке документације.
*Службени гласник РС, број 83/2018
**Службени гласник РС, број 62/2023
1.6 Пројекат за грађевинску дозволу
*Службени гласник РС, број 132/2014
…
Пројекат за грађевинску дозволу подлеже техничкој контроли.
Техничку контролу пројекта за грађевинску дозволу може да врши привредно друштво, односно друго правно лице или предузетник (или више њих за посебне стручне области), која су уписана у одговарајући регистар привредних субјеката и која поседују решење о испуњености услова за пројектовање за ту врсту објеката, односно делова објеката, у складу са овим законом, које одређује инвеститор.
Техничку контролу пројекта за грађевинску дозволу не може да врши одговорни пројектант који је израдио тај пројекат, односно који је запослен у привредном друштву које је израдило тај пројекат или предузећу које је инвеститор.
Техничка контрола пројекта за грађевинску дозволу обухвата нарочито проверу: усклађености са свим условима и правилима садржаним у локацијским условима, законом и другим прописима, техничким нормативима, стандардима и нормама квалитета, као и међусобне усклађености свих делова техничке документације; усклађености пројекта са резултатима претходних истраживања (претходни радови); оцену одговарајућих подлога за темељење објеката; проверу исправности и тачности техничко-технолошких решења објекта и решења грађења објеката; стабилности и безбедности; рационалности пројектованих грађевинских производа; утицаја на животну средину и суседне објекте.
Техничка контрола пројекта за грађевинску дозволу за грађење објеката за које грађевинску дозволу издаје надлежно министарство, односно аутономна покрајина обухвата и проверу усклађености са мерама садржаним у извештају ревизионе комисије.
О извршеној техничкој контроли сачињава се извештај који потписују одговорни пројектанти са одговарајућим лиценцама који су обавили техничку контролу појединачних делова пројекта, а коначни извештај потписује заступник правног лица, односно предузетник из става 2. овог члана.
Трошкове техничке контроле сноси инвеститор.
Брисан је ранији став 7. (види члан 75. Закона - 132/2014-3)
Пројекат за грађевинску дозволу израђен по прописима других земаља подлеже техничкој контроли којом се проверава усклађеност те документације са законом и другим прописима, стандардима, техничким нормативима и нормама квалитета.
Пројекат за грађевинску дозволу из става 8. овог члана мора бити преведен на српски језик.
Идејни пројекат за реконструкцију линијских инфраструктурних објеката из члана 118. став 2. овог закона подлеже техничкој контроли под истим условима, као пројекат за грађевинску дозволу.
*Службени гласник РС, број 132/2014
**Службени гласник РС, број 83/2018”
Informational English translation of the quotation
A preliminary design is prepared for the construction of structures and execution of works under Article 145 of this Law.
A preliminary design is also prepared for the construction of structures and execution of works for structures under Article 133 of this Law, in which case it is subject to expert review by the design review commission.
The preliminary design under paragraph 1 of this Article, prepared for the execution of works under Article 2, item 62) of this Law, is subject to technical review in accordance with this Law, except in the case of reconstruction of electricity distribution and electronic communications networks.
The preliminary design is prepared in accordance with the regulation governing the detailed content of technical documentation.
*Official Gazette of RS, No. 83/2018
**Official Gazette of RS, No. 62/2023
1.6 Design for a construction permit
*Official Gazette of RS, No. 132/2014
…
The design for a construction permit is subject to technical review.
Technical review of the design for a construction permit may be performed by a company or other legal entity or entrepreneur (or several of them for separate professional fields), registered in the appropriate register of business entities and holding a decision confirming fulfilment of the conditions for designing that type of structure or part of a structure in accordance with this Law, as selected by the investor.
Technical review of the design for a construction permit may not be performed by the responsible designer who prepared that design or who is employed by the company that prepared it or by the enterprise that is the investor.
Technical review of the design for a construction permit includes in particular checking: compliance with all conditions and rules contained in the location conditions, law and other regulations, technical regulations, standards and quality standards, and mutual consistency of all parts of the technical documentation; consistency of the design with the results of preliminary investigations (preliminary works); assessment of the appropriate basis for foundation design; correctness and accuracy of technical and technological solutions for the structure and construction solutions; stability and safety; rationality of the specified construction products; and impact on the environment and neighbouring structures.
Technical review of the design for a construction permit for structures for which the competent ministry or autonomous province issues the construction permit also includes checking compliance with the measures contained in the design review commission's report.
A report on the completed technical review is prepared and signed by the appropriately licensed responsible designers who reviewed individual parts of the design, and the final report is signed by the representative of the legal entity or the entrepreneur under paragraph 2 of this Article.
The investor bears the costs of technical review.
Former paragraph 7 was deleted (see Article 75 of the Law - 132/2014-3).
A design for a construction permit prepared under the regulations of other countries is subject to technical review checking its compliance with the law and other regulations, standards, technical regulations and quality standards.
The design for a construction permit under paragraph 8 of this Article must be translated into Serbian.
A preliminary design for reconstruction of linear infrastructure structures under Article 118, paragraph 2 of this Law is subject to technical review under the same conditions as a design for a construction permit.
*Official Gazette of RS, No. 132/2014
**Official Gazette of RS, No. 83/2018Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- How much manoeuvring space must be provided in front of a garage or parking space?There is no single universal figure prescribed by the Law on Planning and Construction for every garage space. For the specific…
- A father owns the plot and his son would be the investor in an application under the unified procedure or for location conditions: is their family relationship sufficient?No. The fact that the father is the owner and the son is his relative does not in itself give the son an appropriate right to…
- What is checked or submitted with an application in the unified procedure as evidence of the appropriate right to the land?First, the appropriate right held by the investor is determined. The Planning and Construction Act lists ownership, lease of…
- What is a building line?A line on, above and below the surface of land and water up to which construction of the basic footprint of a structure is…
- What is a building complex?A whole consisting of several interconnected independent functional units or cadastral parcels, which may have different uses.
- What is included in the gross developed building area?The sum of the areas of all ABOVE-GROUND storeys of the structure, measured at floor level of all parts of the structure, using…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal