Procedures and documentation
What are the consequences for a holder of public authority that fails to act within the time limit?
Answer
Informational English translation. Machine translated; not independently reviewed.
A fine of 10.000 to 50.000 dinars for the responsible person within the holder of public authority. The registrar, or the authority responsible for conducting the unified procedure, files the request to initiate misdemeanour proceedings.
Note: The registrar must file a report — this is a lever when a holder of public authority misses the deadline.
Original Serbian quotation
„Novčanom kaznom od 10.000 do 50.000 dinara kazniće se za prekršaj odgovorno lice u imaocu javnog ovlašćenja, ako imalac javnih ovlašćenja tokom sprovođenja objedinjene procedure ne postupa na način i u rokovima propisanim ovim zakonom (član 8b).”
Informational English translation of the quotation
A fine of 10.000 to 50.000 dinars shall be imposed for a misdemeanour on the responsible person within a holder of public authority if the holder of public authority, during the unified procedure, fails to act in the manner and within the time limits prescribed by this Law (Article 8b).Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- How much manoeuvring space must be provided in front of a garage or parking space?There is no single universal figure prescribed by the Law on Planning and Construction for every garage space. For the specific…
- A father owns the plot and his son would be the investor in an application under the unified procedure or for location conditions: is their family relationship sufficient?No. The fact that the father is the owner and the son is his relative does not in itself give the son an appropriate right to…
- What is checked or submitted with an application in the unified procedure as evidence of the appropriate right to the land?First, the appropriate right held by the investor is determined. The Planning and Construction Act lists ownership, lease of…
- What is a building line?A line on, above and below the surface of land and water up to which construction of the basic footprint of a structure is…
- What is a building complex?A whole consisting of several interconnected independent functional units or cadastral parcels, which may have different uses.
- What is included in the gross developed building area?The sum of the areas of all ABOVE-GROUND storeys of the structure, measured at floor level of all parts of the structure, using…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal