What penalty does the responsible designer face for a technical document contrary to regulations?
Answer
Informational English translation. Machine translated; not independently reviewed.
A fine of 100.000 to 150.000 dinars or imprisonment for up to 30 days — for the responsible designer who prepared and signed a technical document or confirmed it in the technical review procedure contrary to the law and subordinate legislation. The competent construction inspector files the request.
Note: Responsibility is personal and can extend to imprisonment — a signature on a technical document is not a formality.
Original Serbian quotation
„Novčanom kaznom od 100.000 do 150.000 dinara ili kaznom zatvora do 30 dana kazniće se za prekršaj odgovorni projektant koji je izradio i potpisao tehnički dokument ili je potvrdio taj dokument u postupku tehničke kontrole, suprotno odredbama ovog zakona i podzakonskim aktima donetim na osnovu ovog zakona.”
Informational English translation of the quotation
A fine of 100.000 to 150.000 dinars or imprisonment for up to 30 days shall be imposed for a misdemeanour on the responsible designer who prepared and signed a technical document or confirmed that document in the technical review procedure, contrary to the provisions of this Law and subordinate legislation adopted under this Law.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- How much manoeuvring space must be provided in front of a garage or parking space?There is no single universal figure prescribed by the Law on Planning and Construction for every garage space. For the specific…
- A father owns the plot and his son would be the investor in an application under the unified procedure or for location conditions: is their family relationship sufficient?No. The fact that the father is the owner and the son is his relative does not in itself give the son an appropriate right to…
- What is checked or submitted with an application in the unified procedure as evidence of the appropriate right to the land?First, the appropriate right held by the investor is determined. The Planning and Construction Act lists ownership, lease of…
- What is a building line?A line on, above and below the surface of land and water up to which construction of the basic footprint of a structure is…
- What is a building complex?A whole consisting of several interconnected independent functional units or cadastral parcels, which may have different uses.
- What is included in the gross developed building area?The sum of the areas of all ABOVE-GROUND storeys of the structure, measured at floor level of all parts of the structure, using…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal