Procedures and documentation
What is the penalty if a designer or contractor does not have professional liability insurance?
Answer
Informational English translation. Machine translated; not independently reviewed.
500.000 to 2.000.000 dinars for a legal entity, 20.000 to 100.000 dinars for the responsible person, and 100.000 to 500.000 dinars for an entrepreneur.
Original Serbian quotation
„Novčanom kaznom od 500.000 do 2.000.000 dinara kazniće se za prekršaj privredno društvo ili drugo pravno lice koje obavlja poslove izrade i kontrole tehničke dokumentacije, odnosno koje je izvođač radova, vršilac stručnog nadzora ili tehničkog pregleda, ako nije osigurano od odgovornosti za štetu (član 129a).”
Informational English translation of the quotation
A fine of 500.000 to 2.000.000 dinars shall be imposed for a misdemeanour on a company or other legal entity that prepares and reviews technical documentation, or is a works contractor, provider of professional supervision or technical inspection, if it is not insured against liability for damage (Article 129a).Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- How much manoeuvring space must be provided in front of a garage or parking space?There is no single universal figure prescribed by the Law on Planning and Construction for every garage space. For the specific…
- A father owns the plot and his son would be the investor in an application under the unified procedure or for location conditions: is their family relationship sufficient?No. The fact that the father is the owner and the son is his relative does not in itself give the son an appropriate right to…
- What is checked or submitted with an application in the unified procedure as evidence of the appropriate right to the land?First, the appropriate right held by the investor is determined. The Planning and Construction Act lists ownership, lease of…
- What is a building line?A line on, above and below the surface of land and water up to which construction of the basic footprint of a structure is…
- What is a building complex?A whole consisting of several interconnected independent functional units or cadastral parcels, which may have different uses.
- What is included in the gross developed building area?The sum of the areas of all ABOVE-GROUND storeys of the structure, measured at floor level of all parts of the structure, using…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal