Procedures and documentation

Must structures be connected to existing infrastructure?

Answer

Informational English translation. Machine translated; not independently reviewed.

Owners of structures in a part of the territory equipped with utilities are obliged to connect to existing infrastructure depending on the purpose. The Law expressly exempts an owner who submits evidence that renewable energy sources will be used to generate electricity or heat and cool the structure; the scope and other conditions are determined for the particular case.

Original Serbian quotation

„Грађевинско земљиште може бити уређено и неуређено. Уређено грађевинско земљиште је земљиште које је у складу са планским документом комунално опремљено за грађење и коришћење (изграђен приступни пут, електромрежа, обезбеђено снабдевање водом и обезбеђени други услови). Сви власници објеката на територији, односно на делу територије јединице локалне самоуправе који је комунално опремљен за грађење и коришћење, а нарочито који има постојећу инфраструктуру водовода, канализације, гасовода и даљинског грејања, дужни су да се прикључе на постојећу инфраструктуру, у зависности од намене објекта. Власник објекта који достави доказ да ће за производњу електричне енергије, односно грејање и хлађење објекта користити обновљиве изворе енергије, нема обавезу прописану ставом 3. овог члана. Прикључење објеката на инфраструктуру из става 3. овог члана од стране привредног друштва чији је оснивач Република Србија, аутономна покрајина или јединица локалне самоуправе врши се уз накнаду стварних трошкова набавке опреме, уређаја, материјала и радова који настају приликом прикључења корисника. Одлуку о висини и начину плаћања стварних трошкова из става 5. овог члана доноси јединица локалне самоуправе у року од шест месеци од дана ступања на снагу овог закона. Правно лице из става 5. овог члана закључује уговор са корисником, којим се регулишу међусобна права и обавезе. Изузетно од става 6. овог члана, одлуку о висини и начину плаћања стварних трошкова прикључења на дистрибутивну гасоводну мрежу одређује оператор дистрибутивног система на чији систем се одобрава прикључење, а висина трошкова се одређује на основу методологије Агенције за енергетику Републике Србије, у складу са законом којим се уређује енергетика. Имаоци јавних овлашћења у поступку који претходи издавању локацијских услова, за изградњу нових објеката или извођење радова из члана 145. овог закона, дужни су да издају услове за прикључење из става 3. овог члана.”
Informational English translation of the quotation
Construction land may be serviced or unserviced. Serviced construction land is land equipped with utilities for construction and use in accordance with the planning document (an access road and electricity network have been built, water supply secured and other conditions provided). All owners of structures in the territory or part of the territory of a local self-government unit equipped with utilities for construction and use, particularly where there is existing water supply, sewerage, gas and district heating infrastructure, are obliged to connect to existing infrastructure, depending on the purpose of the structure. An owner of a structure who submits evidence that renewable energy sources will be used to generate electricity or heat and cool the structure does not have the obligation prescribed in paragraph 3 of this Article. Connection of structures to the infrastructure referred to in paragraph 3 of this Article by a company founded by the Republic of Serbia, an autonomous province or a local self-government unit shall be carried out against reimbursement of the actual costs of procuring equipment, devices, materials and works incurred when connecting the user. The local self-government unit shall decide on the amount and method of payment of the actual costs referred to in paragraph 5 of this Article within six months of the entry into force of this Law. The legal entity referred to in paragraph 5 of this Article shall conclude a contract with the user regulating their mutual rights and obligations. By exception to paragraph 6 of this Article, the decision on the amount and method of payment of the actual costs of connection to the gas distribution network shall be made by the distribution system operator to whose system connection is approved, and the amount of the costs shall be determined on the basis of the methodology of the Energy Agency of the Republic of Serbia, in accordance with the law governing energy. In the procedure preceding the issuance of location conditions for the construction of new structures or execution of works under Article 145 of this Law, holders of public authority are obliged to issue the connection conditions referred to in paragraph 3 of this Article.

Official source ↗

Regulation
Zakon o planiranju i izgradnji
Article
Art. 91
Official gazette
Sl. glasnik RS, br. 72/2009, 81/2009, 64/2010, 24/2011, 121/2012, 42/2013, 50/2013, 98/2013, 132/2014, 145/2014, 83/2018, 31/2019, 37/2019, 9/2020, 52/2021, 62/2023, 91/2025 i 80/2026
Topic
Procedures and documentation

Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.

Explore related rules →

Related questions

Search building rules

The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal

SEARCH
Select Language