Plot and building position
What does a detailed regulation plan contain?
Answer
Informational English translation. Machine translated; not independently reviewed.
The plan boundaries and extent of the construction area with division into units and zones, detailed land designations, regulation lines of streets and public areas and building lines with setting-out elements on a geodetic base, elevation levels of streets and public areas, a list of parcels and descriptions of sites for public areas, infrastructure corridors and capacities, measures to protect monuments and natural areas, locations for a mandatory urban design project or competition, and development and construction rules by units and zones.
Original Serbian quotation
„1) granice plana i obuhvat građevinskog područja, podelu prostora na posebne celine i zone; 2) detaljnu namenu zemljišta; 3) regulacione linije ulica i javnih površina i građevinske linije sa elementima za obeležavanje na geodetskoj podlozi; 4) nivelacione kote ulica i javnih površina (nivelacioni plan)”
Informational English translation of the quotation
1) plan boundaries and extent of the construction area, division of the area into separate units and zones; 2) detailed land designations; 3) regulation lines of streets and public areas and building lines with setting-out elements on a geodetic base; 4) elevation levels of streets and public areas (levelling plan)Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- How much manoeuvring space must be provided in front of a garage or parking space?There is no single universal figure prescribed by the Law on Planning and Construction for every garage space. For the specific…
- A father owns the plot and his son would be the investor in an application under the unified procedure or for location conditions: is their family relationship sufficient?No. The fact that the father is the owner and the son is his relative does not in itself give the son an appropriate right to…
- What is checked or submitted with an application in the unified procedure as evidence of the appropriate right to the land?First, the appropriate right held by the investor is determined. The Planning and Construction Act lists ownership, lease of…
- What is a building line?A line on, above and below the surface of land and water up to which construction of the basic footprint of a structure is…
- What is a building complex?A whole consisting of several interconnected independent functional units or cadastral parcels, which may have different uses.
- What is included in the gross developed building area?The sum of the areas of all ABOVE-GROUND storeys of the structure, measured at floor level of all parts of the structure, using…