Procedures and documentation
Where may applications for structures larger than 20.000 m² be submitted?
Answer
Informational English translation. Machine translated; not independently reviewed.
For structures over 20000 m² throughout the territory, the developer may submit applications for construction acts to the local self-government unit or the ministry. If the developer obtained location conditions from the local self-government unit, the application for a construction permit may be submitted to the ministry without design review (revizija) and without the special regime for preparing documentation and executing works under Articles 126/150 of the ZPI, pursuant to Article 52 paragraph 2.
Note: This is not an exemption from all licences, technical review or other statutory conditions, nor a universal assumption of responsibility for every structure by the local self-government unit.
Original Serbian quotation
„У односу на објекте преко 20.000 m², на целој територији Републике Србије инвеститор изградње објекта може поднети захтев за издавање свих аката за изградњу објеката јединици локалне самоуправе или министарству надлежном за послове грађевинарства.
Ако је инвеститор из става 1. овог члана прибавио локацијске услове од надлежног органа јединице локалне самоуправе, може поднети захтев за издавање грађевинске дозволе министарству надлежном за послове грађевинарства без обавезе спровођења поступка ревизије пројекта и без обавезе израде техничке документације и извођења радова у складу са одредбама чл. 126. и 150. Закона.”
Informational English translation of the quotation
For structures over 20.000 m², throughout the territory of the Republic of Serbia, the developer constructing the structure may submit applications for issuance of all acts for construction of structures to the local self-government unit or the ministry responsible for construction.
If the developer referred to in paragraph 1 of this Article has obtained location conditions from the competent authority of the local self-government unit, the developer may submit an application for a construction permit to the ministry responsible for construction without the obligation to conduct a design review (revizija) procedure and without the obligation to prepare technical documentation and execute works in accordance with Articles 126 and 150 of the Act.Informational finding. An AI check is not legal or professional confirmation that the rule applies to your building. Check the full article and current official gazette.
Related questions
- If technical documentation is submitted in DWF/DWFX/DWG, must a PDF also be provided?Yes. DWF/DWFX/DWG is permitted in prescribed cases, but a copy in PDF format, appropriately electronically signed, must also be…
- Is a CEOP application submitted and signed through CIS?Yes. The relevant application is completed through CIS and signed with the qualified electronic signature of the applicant or…
- In what format is a site plan submitted to CEOP?The site plan must also be submitted in DWG or DXF format, georeferenced in the national coordinate system, together with the…
- What must be attached when a CEOP application is submitted through an authorised representative?A power of attorney in electronic PDF form with a qualified electronic signature, or a properly digitised power of attorney…
- Koliko puta mogu da iskoristim pravo na usaglaseni zahtev bez ponovnog placanja administrativne takse i bez ponovnog dostavljanja vec podnete dokumentacije?Pogodnost usaglašenog zahtjeva bez ponovne dokumentacije i već plaćenih taksi/naknada koristi se samo jednom u odgovarajućem…
- Kako se izdaje klauzula pravnosnažnosti i ispravlja greška akta?Donosilac po službenoj dužnosti ili zahtjevu stranke izdaje klauzulu pravnosnažnosti kao propisno elektronski sastavljenu…
The portal presents AI-checked informational findings. It does not replace official legislation, location conditions or professional review of a specific project. Portal