Database statistics · as of
What the database contains
Rule counts are read when this page opens. Planning data and history come from saved snapshots with separate dates. A source count does not establish that every regulation is in force or legally verified.
- 457 verified 27.4%
- 1,101 AI-extracted 66.0%
- 110 under revision 6.6%
Verified share of public rules: 29.3% (457 / 1,558).
Database growth
Historical points reconstruct saved repository versions. A commit date is neither a portal publication date nor a regulation’s effective date.
The history snapshot matches the current inputs and counts.
- Verified
- AI-extracted
- Under revision
Net change in record count per day
From 39 records (1 Sep 2026 08:46) to 1,668 (8 Sep 2026 09:15), across 74 database versions with changed counts. The count has not changed since the last change.
Table: all database versions (74)
| Date and time | Record | Total | Verified | Change |
|---|---|---|---|---|
| Fix legal registry freshness, statistics and parcel map reliability | 1,668 | 457 | 0 | |
| Dodaj devet propisa, dnevnik promjena, citiranje i veze između pravila | 1,668 | 457 | +14 | |
| Zamijeni dva ukinuta propisa, dopuni registar i uvedi „Nauči propis" | 1,654 | 445 | +133 | |
| Zakoni: P1 needs-data direktni odgovori | 1,521 | 441 | +2 | |
| Zakoni: P1 acceptance quality i potvrđena pravila | 1,519 | 439 | +25 | |
| Zakoni: P0 tehnička dokumentacija i pristupačnost (#16) | 1,494 | 414 | +24 | |
| CEOP: potvrdi formalne razloge i usaglašeni zahtev (#15) | 1,470 | 390 | +17 | |
| ZOP: potvrđeni P0 sloj čl. 29–44 | 1,453 | 373 | 0 | |
| EIA 94/2024 + Uredba 106/2025: čisti P0 paket | 1,453 | 339 | +32 | |
| ZPI 80/2026: aktuelna pravila i datumi | 1,421 | 307 | +10 | |
| Add current registration and housing rules (#11) | 1,411 | 297 | +65 | |
| Zakoni: dublji Evrokod i konstrukcije | 1,346 | 233 | +18 | |
| Zakoni: BZR projektovanje i gradilišta | 1,328 | 215 | +13 | |
| Zakoni: skloništa i savremena pravila sklanjanja | 1,315 | 202 | +18 | |
| Zakoni: hospitality i kategorizacija smeštaja | 1,297 | 184 | +40 | |
| Zakoni: visoki objekti zaštita od požara | 1,257 | 144 | +26 | |
| Zakoni: dodaj ZUP pravila za Sekretarijat | 1,231 | 118 | +21 | |
| Zakoni: dodaj kulturno nasleđe i pravila Zavoda | 1,210 | 118 | +23 | |
| Zakon o putevima: atomska pravila, šema i MCP regresija | 1,187 | 118 | +37 | |
| Vode 117: uslove sa pragovima vezi za sirove projektne cinjenice | 1,150 | 81 | +1 | |
| Zakon o vodama 117-133: dodaj atomska vodna pravila | 1,149 | 80 | +55 | |
| Zakon o zaštiti od požara 29-44: dodaj projektantska i fazna pravila | 1,094 | 25 | +37 | |
| Fasade čl. 7: kompletna matrica Tabela 1-3 po tipu zida i kategoriji | 1,057 | 25 | +16 | |
| Fasade 7a-13: strukturisi Tabelu 4 i atomizuj požarne pojaseve | 1,041 | 25 | +22 | |
| Garaže 30-41: produkcioni overlay sa atomskim pravilima i preciznim uslovima | 1,019 | 26 | +20 | |
| Garaže 38-41: popravi odimljavanje i razdvoji CO pragove | 999 | 26 | +2 | |
| Garaže 37: atomizuj ventilaciju i CO proračun | 997 | 26 | +5 | |
| Garaže 36: dodaj BD2 i razdvoji napajanje i osvetljenje | 992 | 26 | +4 | |
| Garaže 30-35: atomizuj pravila i uslove primene | 988 | 26 | +4 | |
| Ne objavljuj poznato zastarelo pravilo o zastitnom pojasu puta | 984 | 26 | 0 | |
| Javna stranica /pravila: tabela izvora, PGR i legenda | 984 | 26 | +27 | |
| Gradjevinski dnevnik i knjiga inspekcije — 20/20, +15 pravila | 957 | 26 | +15 | |
| Energetska efikasnost (25/25) i energetski pasosi (23/23) zavrseni, +36 pravila | 942 | 26 | +36 | |
| Klasifikacija objekata (7/7) i fasade (20/20) zavrsene, +31 pravilo | 906 | 26 | +29 | |
| Garaze (38/38) i stanovi (51/51) zavrseni, +59 pravila | 877 | 28 | +59 | |
| Zakon o planiranju i izgradnji — zavrsen (241/241), +159 pravila | 818 | 28 | +82 | |
| ZPI — cl. 3a-70 (+77 pravila) | 736 | 28 | +77 | |
| Zastita od pozara stambenih, poslovnih i javnih objekata — 59/59, +79 pravila | 659 | 28 | +37 | |
| Uredba o lokacijskim uslovima — završeno (+4 finalni) | 622 | 28 | +46 | |
| Sadrzina tehnicke dokumentacije — ceo pravilnik obradjen (90/90), +97 pravila | 576 | 28 | +97 | |
| Pristupacnost — ceo pravilnik obradjen (48/48), +114 pravila | 479 | 28 | +114 | |
| Uredba o lokacijskim uslovima — zavrsena (cl. 23, 34, 36-38, 40) + ispravke 3 citata | 365 | 28 | +7 | |
| Uredba — čl. 32–37 (+2) | 358 | 28 | +1 | |
| Uredba — čl. 26–31 (+7) | 357 | 28 | +7 | |
| Uredba — čl. 5–7, 23–25 (+10) | 350 | 28 | +10 | |
| Uredba o lokacijskim uslovima — članova 8–22 — početak (+20) | 340 | 28 | +8 | |
| Propis #2 — Uredba o lokacijskim uslovima — početak (+7) | 332 | 28 | +7 | |
| CEOP: registri i čuvanje dokumenata — završetak propisa #1 (+7) | 325 | 28 | +7 | |
| CEOP: završne odredbe — neusaglašenosti, rušenje, preuzimanje (+7) | 318 | 28 | +7 | |
| CEOP: završetni članovi i upis svojine (+7) | 311 | 28 | +7 | |
| CEOP: infrastruktura i upotrebna dozvola (+7) | 304 | 28 | +7 | |
| CEOP: faze izgradnje i zaštita od požara (+7) | 297 | 28 | +7 | |
| CEOP: privremene dozvole i prijava radova (+7) | 290 | 28 | +7 | |
| CEOP: izmene dozvola i odobrenje radova (+7) | 283 | 28 | +7 | |
| CEOP: građevinska dozvola — zahtevi i rokovi (+7) | 276 | 28 | +7 | |
| CEOP: lokacijski uslovi — rokovi i odbacivanje (+7) | 269 | 28 | +7 | |
| Pravilnik o postupku sprovođenja — proceduralna pravila (+7) | 262 | 28 | +7 | |
| CEOP: formalni uslovi i odbacivanje zahteva (+9) | 255 | 28 | +9 | |
| Struktura tehnicke dokumentacije (+8); citljiva greska pri neispravnom JSON-u | 246 | 28 | +8 | |
| Tema pozar: evakuacija i mere po nameni objekta (+9) | 238 | 28 | +9 | |
| Tema visina: kota prizemlja razlozena po terenu, referentna fasada (+6) | 229 | 28 | +5 | |
| ZPI paket 4: osnov za lokacijske uslove, pristup preko sluzbenosti (+9) | 224 | 28 | +9 | |
| ZPI paket 3: tehnicka dokumentacija, gradiliste, tehnicki pregled (+13) | 215 | 28 | +13 | |
| ZPI: 25 pravila sa doslovnim citatima; NAPREDAK meri pokrivenost clanova | 202 | 28 | +25 | |
| Tema rastojanja: razlozena zbirna pravila i dodati merljivi pragovi | 177 | 28 | +7 | |
| Tema parking zaokruzena (+10); revizija sada proverava i pravila iz PGR-a | 170 | 29 | +9 | |
| Tema parking: garazni pravilnik (+19); revizija proverava i broj clana | 161 | 23 | +18 | |
| Tema parking: dimenzije, rampe i normativi po nameni (+15) | 143 | 24 | +14 | |
| Tema parking: pristupacno parkiranje (12 pravila sa pragovima) | 129 | 24 | +12 | |
| Baza pravila: parcelacija 100%, merenje pokrivenosti, paginacija | 117 | 24 | +44 | |
| Baza pravila: serija 4 — zastita od pozara (22/2019) | 73 | 24 | +9 | |
| Baza pravila: serija 3 (tehnicka dokumentacija) + NAPREDAK.md | 64 | 24 | +13 | |
| Baza pravila: revizija kroz proveru citata + serija 2 | 51 | 24 | +12 | |
| Baza pravila u SQLite + stranica za pregled i pretragu | 39 | 27 | — |
Where the rules come from
Public rules by source and by subject area. The green part of each bar is verified; the blue part is AI-extracted from the text with an article and a quote.
By regulation 37 sources
Another 25 sources with 395 rules in total (276 verified). All regulations →
By subject area 21 areas
Another 9 areas with 15 rules in total.
Parcel planning data
Confirmed subzones have an audit matching the current chain of acts. Pending and revision lists may overlap; their sum is not a subzone total or coverage of all parcels.
- 119 currently verified 31.7%
- 87 in the revision queue 23.2%
- 169 blocked 45.1%
Blocked: 97 with no rule PDF on Beoland, 72 without a direct-implementation code. Revision queue as of 5 Sep 2026, less the subzones verified since.
Saved GIS catalogs are earlier extracted snapshots. Their counts do not represent the complete local Beoland copy.
Show remaining subzones (87)
These subzones do not yet have current verification in the catalog. The reasons below come from the revision queue snapshot dated 2026-09-05. This is not a new audit: some amendments have since been reviewed, but subzones remain listed until fully verified. This list covers the revision queue only, not every unverified zone or parcel.
| Subzone | Recorded reason for review |
|---|---|
| 1.K1.1 |
|
| 1.M1.1 |
|
| 1.M1.2 |
|
| 1.M4.1 |
|
| 1.S6.2 |
|
| 1.S6.3 |
|
| 1.S9.1 |
|
| 2.K1.1 |
|
| 2.M4.1 |
|
| 2.M4.2 |
|
| 2.M4.3 |
|
| 2.S6.2 |
|
| 2.S6.3 |
|
| 2.S9.1 |
|
| 3.M4.3 |
|
| 3.S7.2 |
|
| 3.S9.1 |
|
| 5.M4.1 |
|
| 5.P1.1 |
|
| 5.P1.2 |
|
| 5.P2.1 |
|
| 5.S9.1 |
|
| 6.M5.1 |
|
| 6.P2.1 |
|
| 6.P2.2 |
|
| 6.S9.1 |
|
| 7.K2.1 |
|
| 7.M5.2 |
|
| 7.S1.2 |
|
| 7.S6.1 |
|
| 7.S6.3 |
|
| 7.S9.1 |
|
| 7.S10.1 |
|
| 8.M6.1 |
|
| 8.P2.1 |
|
| 8.S2.1 |
|
| 8.S6.2 |
|
| 9.K1.1 |
|
| 9.K2.1 |
|
| 9.K3.1 |
|
| 9.K4.1 |
|
| 9.M4.2 |
|
| 9.S9.1 |
|
| 10.K2.1 |
|
| 10.K4.1 |
|
| 10.M4.1 |
|
| 10.M4.2 |
|
| 10.S6.1 |
|
| 10.S9.1 |
|
| 10.S9.2 |
|
| 10.S10.1 |
|
| 10.S10.2 |
|
| 11.M6.1 |
|
| 11.P1.1 |
|
| 11.P2.1 |
|
| 11.S2.1 |
|
| 13.M5.2 |
|
| 13.P1.1 |
|
| 13.S6.3 |
|
| 13.S9.1 |
|
| 14.S9.1 |
|
| 15.P2.1 |
|
| 15.S9.1 |
|
| 16.K4.1 |
|
| 16.M4.1 |
|
| 16.M5.1 |
|
| 16.M6.1 |
|
| 16.S9.1 |
|
| 17.K4.1 |
|
| 17.M4.1 |
|
| 17.M5.1 |
|
| 17.M5.2 |
|
| 17.M6.1 |
|
| 17.P1.1 |
|
| 17.S1.1 |
|
| 17.S9.1 |
|
| 17.S10.1 |
|
| 17.S10.2 |
|
| 17.S10.3 |
|
| 18.K4.1 |
|
| 18.M5.1 |
|
| 18.M5.2 |
|
| 18.M6.1 |
|
| 18.S6.1 |
|
| 18.S6.2 |
|
| 18.S9.1 |
|
| 19.S10.1 |
|
Local Beoland copy
Counts come from complete local layers used by parcel analysis. GIS records contain geometry and attributes; they are not counts of regulations or verified legal conclusions.
Layer downloads — oldest / latest: 27 Sep 2026 04:15 / 27 Sep 2026 05:53 (yesterday). Download dates do not confirm legal currency.
Data timestamps
A technical snapshot date is not a legal verification date. Recorded review dates apply only to the records carrying them, not the entire corpus.
| Source | Date / time | Age |
|---|---|---|
| Regulation index — generated | 7 days ago | |
| History snapshot — generated | 6 days ago | |
| Last historical point with changed counts | 20 days ago | |
| Oldest recorded source review | 25 days ago | |
| Latest recorded source review | 25 days ago | |
| Verified subzone snapshot — generated | 22 days ago | |
| Pending subzone snapshot — generated | 23 days ago | |
| Revision queue — generated | 23 days ago | |
| Belgrade decision on the land development contribution — last source check | 7 days ago | |
| Belgrade decision on city zones — last source check | 7 days ago | |
| Contribution base — Directorate table — last source check | 7 days ago | |
| Tehnička uputstva za projektovanje garaža — last source check | 7 days ago | |
| Official Gazette of Belgrade — new issues — last source check | · reviewed up to issue 78/2026 | 7 days ago |
Records with a review date: 10. This is not the number of officially confirmed current regulations. City decisions, the contribution base, guidelines and the city gazette are checked by a separate tool; the date means the source was unchanged at that check.Source freshness checks